Port Arthur LNG Phase 1 (Trains 1-2) is a new LNG export terminal by Sempra Infrastructure in TX. It is under construction, with a final investment decision taken. Stated liquefaction capacity is 1.86 Bcf/d (derived (FERC list split) figure), or 13 MTPA. Trains: 2 (Trains 1-2). Timing is stated as T1 2027; T2 2028. FERC docket CP17-20. Sources: FERC, the Department of Energy, trade press and EIA's liquefaction capacity file. Last verified by Enercast on Nov 27, 2026.
| Status | Under construction | |
|---|---|---|
| Capacity | 1.86 Bcf/d derived derived (FERC list split) figure Phase 1 only. 1.86 Bcf/d is DERIVED: half of the 3.72 Bcf/d FERC lists for Phases 1 and 2 together, split evenly by Enercast. For comparison, EIA's nominal figure for Trains 1-2 is 1.581 Bcf/d (peak 1.778). 13 MTPA as stated by Sempra. Phase 2 (Trains 3-4) and Port Arthur LNG North (Trains 5-8) are listed separately. Split from the combined listing on 2026-11-27. | |
| Capacity, MTPA | 13 stated | |
| DOE non-FTA export authorization | 3.82 Bcf/d | |
| Trains | 2 (Trains 1-2) | |
| Timing | T1 2027; T2 2028 stated | |
| Sponsor | Sempra Infrastructure | |
| Project type | New terminal | |
| Terminal | — | — |
| Location | TX | |
| Region | US Gulf Coast | |
| Regulator | FERC (onshore terminal) | |
| FERC docket | CP17-20 | |
| Last verified | Nov 27, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Capacity and timing are what the source states. None is measured or forecast by Enercast. How to read this page. The website and free subscribers get updates weekly. Pro subscribers get them daily.
Milestones
No dated milestones recorded yet. They are added as FERC orders and letters, DOE authorizations and the sponsor’s own announcements (FID, first LNG, first cargo) appear.
Trains
| Train | Bcf/d | Basis | Timing as stated | Note |
|---|---|---|---|---|
| Trains 1-2 | 1.58 | EIA nominal | 2027 | EIA row 'Port Arthur LNG Phase 1 Trains 1-2'; peak 1.778 Bcf/d; EIA file released 2025-06-30 |
From EIA’s U.S. liquefaction capacity file and FERC filings, as stated. EIA’s file is updated irregularly; the project’s own timing above is the more recent statement.
Change log
No changes since this project was first listed on Nov 25, 2026.
Sources
- Trade press, May 29, 2025: OGJ: Port Arthur LNG Phase 1 Trains 1 and 2 expected in 2027 and 2028“Port Arthur LNG Phase 1 is currently under construction and consists of Trains 1 and 2-with expected commercial operation dates of 2027 and 2028, respectively”
- FERC, Oct 15, 2026: FERC eLibrary 20261015-3087 (CP17-20): Order/Opinion / Delegated Order
- FERC, Nov 17, 2026: FERC LNG export terminals list as of 2026-11-17
- DOE: DOE LNG Snapshot Sep 2026
- EIA, Jun 30, 2025: EIA U.S. Liquefaction Capacity file, release 2025-06-30