Enercast  /  New LNG Export  /  Port Arthur LNG Phase 1 (Trains 1-2)

Port Arthur LNG Phase 1 (Trains 1-2)

Sempra Infrastructure · 1.86 Bcf/d stated · Under construction

Port Arthur LNG Phase 1 (Trains 1-2) is a new LNG export terminal by Sempra Infrastructure in TX. It is under construction, with a final investment decision taken. Stated liquefaction capacity is 1.86 Bcf/d (derived (FERC list split) figure), or 13 MTPA. Trains: 2 (Trains 1-2). Timing is stated as T1 2027; T2 2028. FERC docket CP17-20. Sources: FERC, the Department of Energy, trade press and EIA's liquefaction capacity file. Last verified by Enercast on Nov 27, 2026.

StatusUnder construction
Capacity1.86 Bcf/d derived derived (FERC list split) figure
Phase 1 only. 1.86 Bcf/d is DERIVED: half of the 3.72 Bcf/d FERC lists for Phases 1 and 2 together, split evenly by Enercast. For comparison, EIA's nominal figure for Trains 1-2 is 1.581 Bcf/d (peak 1.778). 13 MTPA as stated by Sempra. Phase 2 (Trains 3-4) and Port Arthur LNG North (Trains 5-8) are listed separately. Split from the combined listing on 2026-11-27.
Capacity, MTPA13 stated
DOE non-FTA export authorization3.82 Bcf/d
Trains2 (Trains 1-2)
TimingT1 2027; T2 2028 stated
SponsorSempra Infrastructure
Project typeNew terminal
Terminal——
LocationTX
RegionUS Gulf Coast
RegulatorFERC (onshore terminal)
FERC docketCP17-20
Last verifiedNov 27, 2026all sources fetched

Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.

Capacity and timing are what the source states. None is measured or forecast by Enercast. How to read this page. The website and free subscribers get updates weekly. Pro subscribers get them daily.

Milestones

No dated milestones recorded yet. They are added as FERC orders and letters, DOE authorizations and the sponsor’s own announcements (FID, first LNG, first cargo) appear.

Trains

TrainBcf/dBasisTiming as statedNote
Trains 1-21.58EIA nominal2027EIA row 'Port Arthur LNG Phase 1 Trains 1-2'; peak 1.778 Bcf/d; EIA file released 2025-06-30

From EIA’s U.S. liquefaction capacity file and FERC filings, as stated. EIA’s file is updated irregularly; the project’s own timing above is the more recent statement.

Change log

No changes since this project was first listed on Nov 25, 2026.