Plaquemines LNG Expansion is a set of new liquefaction trains at an existing terminal by Venture Global in LA. It has an application pending and is not yet approved. Stated liquefaction capacity is 4.45 Bcf/d (FERC list figure). Timing is stated as FID H1 2027. FERC docket CP26-27. Sources: FERC and trade press. Last verified by Enercast on Nov 27, 2026.
| Status | Applied | |
|---|---|---|
| Capacity | 4.45 Bcf/d stated FERC list figure | |
| Capacity, MTPA | Not stated | — |
| Trains | — | — |
| Timing | FID H1 2027 stated | |
| Sponsor | Venture Global | |
| Project type | New trains at existing terminal | |
| Terminal | Plaquemines · observed feedgas, daily → | |
| Location | LA | |
| Region | US Gulf Coast | |
| Regulator | FERC (onshore terminal) | |
| FERC docket | CP26-27 | |
| Last verified | Nov 27, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Capacity and timing are what the source states. None is measured or forecast by Enercast. How to read this page. The website and free subscribers get updates weekly. Pro subscribers get them daily.
Feed gas into the Plaquemines terminal is measured daily from pipeline postings on its LNG feedgas page: that is where a commissioning ramp shows up first.
Milestones
No dated milestones recorded yet. They are added as FERC orders and letters, DOE authorizations and the sponsor’s own announcements (FID, first LNG, first cargo) appear.
Change log
No changes since this project was first listed on Nov 25, 2026.
Sources
- Trade press, Aug 11, 2026: Argus 2026-08-11
- FERC, Nov 17, 2026: FERC LNG export terminals list as of 2026-11-17