Louisiana LNG (formerly Driftwood)

Woodside · 3.81 Bcf/d stated · Under construction

Louisiana LNG (formerly Driftwood) is a new LNG export terminal by Woodside in LA. It is under construction, with a final investment decision taken. Stated liquefaction capacity is 3.81 Bcf/d (FERC list figure). Timing is stated as 2029 (est., DOE). FERC docket CP17-117. Sources: FERC, the Department of Energy and EIA's liquefaction capacity file. Last verified by Enercast on Nov 27, 2026.

StatusUnder construction
Capacity3.81 Bcf/d stated FERC list figure
MTPA stated as: 16.5 (Phase 1)
Capacity, MTPANot stated—
DOE non-FTA export authorization3.88 Bcf/d
Trains——
Timing2029 (est., DOE) stated
SponsorWoodside
Project typeNew terminal
Terminal——
LocationLA
RegionUS Gulf Coast
RegulatorFERC (onshore terminal)
FERC docketCP17-117
Last verifiedNov 27, 2026all sources fetched

Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.

Capacity and timing are what the source states. None is measured or forecast by Enercast. How to read this page. The website and free subscribers get updates weekly. Pro subscribers get them daily.

Milestones

No dated milestones recorded yet. They are added as FERC orders and letters, DOE authorizations and the sponsor’s own announcements (FID, first LNG, first cargo) appear.

Trains

TrainBcf/dBasisTiming as statedNote
Trains 1-30.73EIA nominal2029EIA row 'Woodside Louisiana LNG Phase 1 Trains 1-3'; peak 2.181 Bcf/d; EIA file released 2025-06-30

From EIA’s U.S. liquefaction capacity file and FERC filings, as stated. EIA’s file is updated irregularly; the project’s own timing above is the more recent statement.

Change log

No changes since this project was first listed on Nov 25, 2026.