Freeport LNG Train 4 is a set of new liquefaction trains at an existing terminal by Freeport LNG in TX. It is approved but has no final investment decision yet. Stated liquefaction capacity is 0.74 Bcf/d (FERC list figure). Trains: 1. FERC docket CP17-470. Sources: FERC and the Department of Energy. Last verified by Enercast on Nov 27, 2026.
| Status | Approved | |
|---|---|---|
| Capacity | 0.74 Bcf/d stated FERC list figure DOE non-FTA authorisation: 3.10 (whole terminal) Bcf/d | |
| Capacity, MTPA | Not stated | — |
| Trains | 1 | |
| Timing | Not stated | — |
| Sponsor | Freeport LNG | |
| Project type | New trains at existing terminal | |
| Terminal | Freeport · observed feedgas, daily → | |
| Location | TX | |
| Region | US Gulf Coast | |
| Regulator | FERC (onshore terminal) | |
| FERC docket | CP17-470 | |
| Last verified | Nov 27, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Capacity and timing are what the source states. None is measured or forecast by Enercast. How to read this page. The website and free subscribers get updates weekly. Pro subscribers get them daily.
Feed gas into the Freeport terminal is measured daily from pipeline postings on its LNG feedgas page: that is where a commissioning ramp shows up first.
Milestones
No dated milestones recorded yet. They are added as FERC orders and letters, DOE authorizations and the sponsor’s own announcements (FID, first LNG, first cargo) appear.
Change log
No changes since this project was first listed on Nov 25, 2026.
Sources
- FERC, Nov 17, 2026: FERC LNG export terminals list as of 2026-11-17
- DOE: DOE LNG Snapshot Sep 2026