Delfin FLNG 1 is a floating LNG export project by Delfin Midstream in LA (federal waters). It is under construction, with a final investment decision taken. Stated liquefaction capacity is 0.6 Bcf/d (DOE figure), or 4.4 MTPA. Trains: 1 vessel. Timing is stated as 2030. Sources: the Department of Energy, the sponsor's public material and trade press. Last verified by Enercast on Nov 27, 2026.
| Status | Under construction | |
|---|---|---|
| Capacity | 0.6 Bcf/d stated DOE figure | |
| Capacity, MTPA | 4.4 stated | |
| DOE non-FTA export authorization | 1.8 Bcf/d | |
| Trains | 1 vessel | |
| Timing | 2030 stated | |
| Sponsor | Delfin Midstream | |
| Project type | Floating LNG | |
| Terminal | — | — |
| Location | LA (federal waters) | |
| Region | US Gulf Coast | |
| Regulator | MARAD and U.S. Coast Guard (offshore deepwater port) | |
| Other permits | MARAD deepwater port | |
| Last verified | Nov 27, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Capacity and timing are what the source states. None is measured or forecast by Enercast. How to read this page. The website and free subscribers get updates weekly. Pro subscribers get them daily.
Milestones
- Final investment decision stated
Change log
No changes since this project was first listed on Nov 25, 2026.
Sources
- Trade press, Jun 3, 2026: S&P 2026-06-03
- Trade press, Jun 3, 2026: S&P: Delfin FID
- DOE: DOE LNG Snapshot Sep 2026
- Company: Delfin Midstream: Delfin LNG site“The Delfin LNG project – 3×4 mtpa”