Corpus Christi Liquefaction Stage 4 is a set of new liquefaction trains at an existing terminal by Cheniere in TX. It has an application pending and is not yet approved. Stated liquefaction capacity is 3.32 Bcf/d (FERC list figure), or 24 MTPA. FERC docket CP26-82. Sources: FERC and the sponsor's public material. Last verified by Enercast on Nov 27, 2026.
| Status | Applied | |
|---|---|---|
| Capacity | 3.32 Bcf/d stated FERC list figure | |
| Capacity, MTPA | 24 stated | Company, read Nov 26, 2026 |
| Trains | — | — |
| Timing | Not stated | — |
| Sponsor | Cheniere | |
| Project type | New trains at existing terminal | |
| Terminal | Corpus Christi · observed feedgas, daily → | |
| Location | TX | |
| Region | US Gulf Coast | |
| Regulator | FERC (onshore terminal) | |
| FERC docket | CP26-82 | |
| Last verified | Nov 27, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Capacity and timing are what the source states. None is measured or forecast by Enercast. How to read this page. The website and free subscribers get updates weekly. Pro subscribers get them daily.
Feed gas into the Corpus Christi terminal is measured daily from pipeline postings on its LNG feedgas page: that is where a commissioning ramp shows up first.
Milestones
No dated milestones recorded yet. They are added as FERC orders and letters, DOE authorizations and the sponsor’s own announcements (FID, first LNG, first cargo) appear.
Change log
No changes since this project was first listed on Nov 25, 2026.
Sources
- FERC, Nov 17, 2026: FERC LNG export terminals list as of 2026-11-17
- Company: Cheniere: Corpus Christi page“have an approximate production capacity of 24 MTPA of LNG. The proposed Project includes four large-scale liquefaction trains, two full-containment LNG storage tanks, three ground flares, and a new marine berth.”