Corpus Christi Liquefaction Stage 3 (Midscale Trains 1-7)

Cheniere · 1.5 Bcf/d stated · In service

Corpus Christi Liquefaction Stage 3 (Midscale Trains 1-7) is a set of new liquefaction trains at an existing terminal by Cheniere in TX. It is in service. Stated liquefaction capacity is 1.5 Bcf/d (trade press figure), or 11.45 MTPA. Trains: 7. It entered service on Aug 28, 2026. FERC docket CP18-512. Sources: FERC, trade press and EIA's liquefaction capacity file.

StatusIn service
Capacity1.5 Bcf/d stated trade press figure
Capacity, MTPA11.45 stated
Trains7
TimingIn service Aug 28, 2026
SponsorCheniere
Project typeNew trains at existing terminal
TerminalCorpus Christi · observed feedgas, daily →
LocationTX
RegionUS Gulf Coast
RegulatorFERC (onshore terminal)
FERC docketCP18-512
Last verifiedNot yetall sources fetched

Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.

Capacity and timing are what the source states. None is measured or forecast by Enercast. How to read this page. The website and free subscribers get updates weekly. Pro subscribers get them daily.

Feed gas into the Corpus Christi terminal is measured daily from pipeline postings on its LNG feedgas page: that is where a commissioning ramp shows up first.

Milestones

Trains

TrainBcf/dBasisTiming as statedNote
Trains 1-71.32EIA nominal2025-02EIA row 'Corpus Christi Liquefaction Stage 3 Trains 1-7G'; peak 1.508 Bcf/d; EIA file released 2025-06-30

From EIA’s U.S. liquefaction capacity file and FERC filings, as stated. EIA’s file is updated irregularly; the project’s own timing above is the more recent statement.

Change log

No changes since this project was first listed on Nov 25, 2026.