Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Bluewater Energy Center

Vector Pipeline · Loc VX091
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.086
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.090
Bcf/d
30-day average
0.091
30 of 30 days posted
30-day high
0.109
Oct 31
30-day low
0.000
Nov 19
Operating capacity
0.250
Bcf/d as posted, timely cycle
Utilization
34%
headroom 66%

Scheduled quantities as posted by Vector Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.086+0.000
Nov 260.086-0.005
Nov 250.091+0.000
Nov 240.091+0.000
Nov 230.091+0.000
Nov 220.091+0.000
Nov 210.091-0.015
Nov 200.106+0.106
Nov 190.000+0.000
Nov 180.000+0.000
Nov 170.000-0.057
Nov 160.057-0.052
Nov 150.108+0.000
Nov 140.108+0.000
Nov 130.108+0.000
Nov 120.108+0.000
Nov 110.108+0.000
Nov 100.108+0.000
Nov 90.108+0.000
Nov 80.108+0.000
Nov 70.108+0.000
Nov 60.108+0.002
Nov 50.106+0.000
Nov 40.106+0.000
Nov 30.106-0.002
Nov 20.108+0.000
Nov 10.108-0.001
Oct 310.109+0.000
Oct 300.109+0.000
Oct 290.109—
89 more days on file for this meter, back to August 1, 2026. Full meter-level history is part of Institutional (API and downloads).
Vector PipelineBluewater Energy Center

Vector PipelinePlant location from EIA Form 860 (plant 62192).

No recent notices matched or named this point, and no severity 3+ notices on Vector Pipeline in the last 30 days. See all Vector Pipeline notices.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Bluewater Energy Center (Vector Pipeline loc VX091) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/vector/vx091/