Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Jackson

Vector Pipeline · Loc JM151
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.065
Bcf/d scheduled
Δ Day-over-day
-0.035
vs Nov 26
7-day average
0.049
Bcf/d
30-day average
0.040
30 of 30 days posted
30-day high
0.100
Nov 26
30-day low
0.010
Nov 10
Operating capacity
0.166
Bcf/d as posted, timely cycle
Utilization
39%
headroom 61%

Scheduled quantities as posted by Vector Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.065-0.035
Nov 260.100+0.035
Nov 250.065+0.000
Nov 240.065+0.050
Nov 230.015+0.000
Nov 220.015+0.000
Nov 210.015-0.045
Nov 200.060+0.030
Nov 190.030-0.012
Nov 180.042-0.027
Nov 170.069+0.015
Nov 160.054+0.000
Nov 150.054+0.005
Nov 140.049-0.009
Nov 130.058+0.033
Nov 120.025-0.021
Nov 110.046+0.036
Nov 100.010-0.020
Nov 90.030+0.000
Nov 80.030+0.000
Nov 70.030+0.000
Nov 60.030-0.015
Nov 50.045+0.011
Nov 40.034-0.006
Nov 30.040+0.010
Nov 20.030+0.012
Nov 10.017+0.007
Oct 310.010-0.020
Oct 300.030+0.000
Oct 290.030—
89 more days on file for this meter, back to August 1, 2026. Full meter-level history is part of Institutional (API and downloads).
Vector PipelineJackson

Vector PipelinePlant location from EIA Form 860 (plant 55270).

No recent notices matched or named this point, and no severity 3+ notices on Vector Pipeline in the last 30 days. See all Vector Pipeline notices.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Jackson (Vector Pipeline loc JM151) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/vector/jm151/