Gas day Nov 26
0.107
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 25
7-day average
0.104
Bcf/d
30-day average
0.135
30 of 30 days posted
30-day high
0.222
Oct 29
30-day low
0.079
Nov 2
Operating capacity
0.272
Bcf/d as posted, evening cycle
Utilization
39%
headroom 61%
Scheduled quantities as posted by Transwestern Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.107 | -0.001 |
| Nov 25 | 0.108 | -0.000 |
| Nov 24 | 0.108 | -0.000 |
| Nov 23 | 0.108 | +0.020 |
| Nov 22 | 0.088 | -0.020 |
| Nov 21 | 0.108 | +0.003 |
| Nov 20 | 0.105 | +0.013 |
| Nov 19 | 0.092 | -0.014 |
| Nov 18 | 0.106 | -0.003 |
| Nov 17 | 0.109 | -0.041 |
| Nov 16 | 0.150 | -0.001 |
| Nov 15 | 0.151 | -0.004 |
| Nov 14 | 0.155 | -0.003 |
| Nov 13 | 0.158 | -0.015 |
| Nov 12 | 0.173 | +0.001 |
| Nov 11 | 0.172 | +0.002 |
| Nov 10 | 0.170 | +0.003 |
| Nov 9 | 0.167 | +0.000 |
| Nov 8 | 0.167 | +0.000 |
| Nov 7 | 0.167 | +0.071 |
| Nov 6 | 0.096 | -0.000 |
| Nov 5 | 0.096 | +0.001 |
| Nov 4 | 0.095 | -0.006 |
| Nov 3 | 0.101 | +0.022 |
| Nov 2 | 0.079 | +0.000 |
| Nov 1 | 0.079 | -0.123 |
| Oct 31 | 0.202 | +0.003 |
| Oct 30 | 0.199 | -0.023 |
| Oct 29 | 0.222 | +0.019 |
| Oct 28 | 0.202 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Transwestern PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
Recent notices on Transwestern Pipeline
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transwestern Pipeline notices →
Transwestern Pipeline · posted 2026-11-19 · effective 2026-11-19 · force majeure
Transwestern Pipeline declared force majeure effective November 19, 2026 at 7:15AM due to a compressor station mechanical failure on the West Texas Lateral. Lateral capacity is reduced from 0.830 Bcf/d to 0.750 Bcf/d, a net cut of 0.080 Bcf/d, through November 21, 2026 at 8:59AM.…
Transwestern Pipeline · posted 2026-11-17 · effective 2026-11-14 · informational
Transwestern Pipeline · posted 2026-11-16 · effective 2026-11-14 · force majeure
Transwestern Pipeline has extended its Force Majeure at the WT-0 Compressor Station (Hagerman, NM) from the originally posted single-day event (Gas Day Nov 15 only) through Gas Day November 17, 2026, now spanning three gas days. The mechanical failure reduces West Texas Lateral c…
SEV 3/5[Transwestern Pipeline] [Force Majeure] Force Majeure - WT-0 Compressor Station (Hagerman, NM).
Transwestern Pipeline · posted 2026-11-15 · effective 2026-11-14 · force majeure
Transwestern Pipeline declared a force majeure on Gas Day November 15, 2026 due to a mechanical failure at the WT-0 Compressor Station in Hagerman, NM, reducing West Texas Lateral capacity from 830,000 MMBtu/d (0.830 Bcf/d) to approximately 750,000 MMBtu/d (0.750 Bcf/d), a net cu…
Transwestern Pipeline · posted 2026-11-04 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27 due to compressor station mechanical failure, has been extended again through Nov 9, 2026 (Revision 2). Capacity remains reduced from 750,000 MMBtu/d to 630,000 MMBtu/d (0.120 Bcf/d net cut), with restoration no…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-11-03 · force majeure
Transwestern Pipeline declared a force majeure due to a compressor station mechanical failure west of Thoreau, reducing westbound capacity from 1.240 Bcf/d to 1.100 Bcf/d (a net cut of 0.140 Bcf/d) effective Gas Day November 3, 2026. The restriction is expected to remain in effec…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27, has been extended through November 5, 2026 (was Nov 3). East Mainline capacity remains restricted from 750,000 MMBtu/d to 630,000 MMBtu/d, a net reduction of 0.120 Bcf/d. Restoration to full 0.750 Bcf/d capacit…
Transwestern Pipeline · posted 2026-10-28 · effective 2026-10-24 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on Transwestern Pipeline
- TARGA ROJO BANCO 0.292 Bcf/d
- TRANS PECOS I/C -0.288 Bcf/d
- Targa Bullmoose 0.262 Bcf/d
- RED CEDAR ARKANSAS LOOP 0.168 Bcf/d
- WILLIAMS FIELD MILAGRO PLANT 0.159 Bcf/d
- TW Grey Wolf 0.136 Bcf/d
- NMG RIO PUERCO BI-DIR -0.133 Bcf/d
- ENTERPRISE CHACO PLANT I/C 0.109 Bcf/d
Cite thisEnercast PipeScrape, Targa Wildcat (Transwestern Pipeline loc 100730) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tw/100730/