Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

Targa Wildcat

Transwestern Pipeline · Loc 100730 · Texas
Processing plant · counted in Supply / Production
Gas day Nov 26
0.107
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 25
7-day average
0.104
Bcf/d
30-day average
0.135
30 of 30 days posted
30-day high
0.222
Oct 29
30-day low
0.079
Nov 2
Operating capacity
0.272
Bcf/d as posted, evening cycle
Utilization
39%
headroom 61%

Scheduled quantities as posted by Transwestern Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.107-0.001
Nov 250.108-0.000
Nov 240.108-0.000
Nov 230.108+0.020
Nov 220.088-0.020
Nov 210.108+0.003
Nov 200.105+0.013
Nov 190.092-0.014
Nov 180.106-0.003
Nov 170.109-0.041
Nov 160.150-0.001
Nov 150.151-0.004
Nov 140.155-0.003
Nov 130.158-0.015
Nov 120.173+0.001
Nov 110.172+0.002
Nov 100.170+0.003
Nov 90.167+0.000
Nov 80.167+0.000
Nov 70.167+0.071
Nov 60.096-0.000
Nov 50.096+0.001
Nov 40.095-0.006
Nov 30.101+0.022
Nov 20.079+0.000
Nov 10.079-0.123
Oct 310.202+0.003
Oct 300.199-0.023
Oct 290.222+0.019
Oct 280.202—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Transwestern Pipeline

Transwestern PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Transwestern Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transwestern Pipeline notices →

Transwestern Pipeline · posted 2026-11-19 · effective 2026-11-19 · force majeure
Transwestern Pipeline declared force majeure effective November 19, 2026 at 7:15AM due to a compressor station mechanical failure on the West Texas Lateral. Lateral capacity is reduced from 0.830 Bcf/d to 0.750 Bcf/d, a net cut of 0.080 Bcf/d, through November 21, 2026 at 8:59AM.…
Transwestern Pipeline · posted 2026-11-17 · effective 2026-11-14 · informational
Transwestern Pipeline · posted 2026-11-16 · effective 2026-11-14 · force majeure
Transwestern Pipeline has extended its Force Majeure at the WT-0 Compressor Station (Hagerman, NM) from the originally posted single-day event (Gas Day Nov 15 only) through Gas Day November 17, 2026, now spanning three gas days. The mechanical failure reduces West Texas Lateral c…
Transwestern Pipeline · posted 2026-11-15 · effective 2026-11-14 · force majeure
Transwestern Pipeline declared a force majeure on Gas Day November 15, 2026 due to a mechanical failure at the WT-0 Compressor Station in Hagerman, NM, reducing West Texas Lateral capacity from 830,000 MMBtu/d (0.830 Bcf/d) to approximately 750,000 MMBtu/d (0.750 Bcf/d), a net cu…
Transwestern Pipeline · posted 2026-11-04 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27 due to compressor station mechanical failure, has been extended again through Nov 9, 2026 (Revision 2). Capacity remains reduced from 750,000 MMBtu/d to 630,000 MMBtu/d (0.120 Bcf/d net cut), with restoration no…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-11-03 · force majeure
Transwestern Pipeline declared a force majeure due to a compressor station mechanical failure west of Thoreau, reducing westbound capacity from 1.240 Bcf/d to 1.100 Bcf/d (a net cut of 0.140 Bcf/d) effective Gas Day November 3, 2026. The restriction is expected to remain in effec…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27, has been extended through November 5, 2026 (was Nov 3). East Mainline capacity remains restricted from 750,000 MMBtu/d to 630,000 MMBtu/d, a net reduction of 0.120 Bcf/d. Restoration to full 0.750 Bcf/d capacit…
Transwestern Pipeline · posted 2026-10-28 · effective 2026-10-24 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Targa Wildcat (Transwestern Pipeline loc 100730) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tw/100730/