Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

WFS IGNACIO PLANT I/C

Transwestern Pipeline · Loc 500535 · Colorado
Processing plant · counted in Supply / Production
Gas day Nov 27
0.041
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.073
Bcf/d
30-day average
0.035
30 of 30 days posted
30-day high
0.097
Nov 25
30-day low
0.012
Oct 31
Operating capacity
0.300
Bcf/d as posted, evening cycle
Utilization
14%
headroom 86%

Scheduled quantities as posted by Transwestern Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.041+0.000
Nov 260.041-0.056
Nov 250.097+0.010
Nov 240.087+0.003
Nov 230.084+0.010
Nov 220.074-0.010
Nov 210.084+0.003
Nov 200.081+0.051
Nov 190.030+0.005
Nov 180.025-0.020
Nov 170.045+0.027
Nov 160.018+0.000
Nov 150.018+0.000
Nov 140.018-0.001
Nov 130.018+0.001
Nov 120.017+0.000
Nov 110.017-0.011
Nov 100.028+0.011
Nov 90.017+0.000
Nov 80.017+0.000
Nov 70.017-0.005
Nov 60.022-0.005
Nov 50.027-0.006
Nov 40.034+0.016
Nov 30.017+0.000
Nov 20.017+0.000
Nov 10.017+0.005
Oct 310.012+0.000
Oct 300.012+0.000
Oct 290.012—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Transwestern Pipeline

Transwestern PipelineState only (Colorado) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Transwestern Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transwestern Pipeline notices →

Transwestern Pipeline · posted 2026-11-19 · effective 2026-11-19 · force majeure
Transwestern Pipeline declared force majeure effective November 19, 2026 at 7:15AM due to a compressor station mechanical failure on the West Texas Lateral. Lateral capacity is reduced from 0.830 Bcf/d to 0.750 Bcf/d, a net cut of 0.080 Bcf/d, through November 21, 2026 at 8:59AM.…
Transwestern Pipeline · posted 2026-11-17 · effective 2026-11-14 · informational
Transwestern Pipeline · posted 2026-11-16 · effective 2026-11-14 · force majeure
Transwestern Pipeline has extended its Force Majeure at the WT-0 Compressor Station (Hagerman, NM) from the originally posted single-day event (Gas Day Nov 15 only) through Gas Day November 17, 2026, now spanning three gas days. The mechanical failure reduces West Texas Lateral c…
Transwestern Pipeline · posted 2026-11-15 · effective 2026-11-14 · force majeure
Transwestern Pipeline declared a force majeure on Gas Day November 15, 2026 due to a mechanical failure at the WT-0 Compressor Station in Hagerman, NM, reducing West Texas Lateral capacity from 830,000 MMBtu/d (0.830 Bcf/d) to approximately 750,000 MMBtu/d (0.750 Bcf/d), a net cu…
Transwestern Pipeline · posted 2026-11-04 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27 due to compressor station mechanical failure, has been extended again through Nov 9, 2026 (Revision 2). Capacity remains reduced from 750,000 MMBtu/d to 630,000 MMBtu/d (0.120 Bcf/d net cut), with restoration no…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-11-03 · force majeure
Transwestern Pipeline declared a force majeure due to a compressor station mechanical failure west of Thoreau, reducing westbound capacity from 1.240 Bcf/d to 1.100 Bcf/d (a net cut of 0.140 Bcf/d) effective Gas Day November 3, 2026. The restriction is expected to remain in effec…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27, has been extended through November 5, 2026 (was Nov 3). East Mainline capacity remains restricted from 750,000 MMBtu/d to 630,000 MMBtu/d, a net reduction of 0.120 Bcf/d. Restoration to full 0.750 Bcf/d capacit…
Transwestern Pipeline · posted 2026-10-28 · effective 2026-10-24 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, WFS IGNACIO PLANT I/C (Transwestern Pipeline loc 500535) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tw/500535/