Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

GCX WAHA

Transwestern Pipeline · Loc 100744 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 27
-0.025
Bcf/d scheduled
Δ Day-over-day
+0.035
vs Nov 26
7-day average
-0.072
Bcf/d
30-day average
-0.105
30 of 30 days posted
30-day high
-0.025
Nov 27
30-day low
-0.193
Nov 12
Operating capacity
0.250
Bcf/d as posted, evening cycle
Utilization
10%
headroom 90%

Scheduled quantities as posted by Transwestern Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.20-0.15-0.10-0.05-0.00Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27-0.025+0.035
Nov 26-0.060+0.031
Nov 25-0.091-0.053
Nov 24-0.038+0.071
Nov 23-0.110-0.026
Nov 22-0.084+0.010
Nov 21-0.094-0.006
Nov 20-0.089+0.007
Nov 19-0.096-0.008
Nov 18-0.088-0.001
Nov 17-0.086+0.068
Nov 16-0.154-0.037
Nov 15-0.118+0.005
Nov 14-0.122+0.036
Nov 13-0.158+0.034
Nov 12-0.193-0.013
Nov 11-0.179-0.024
Nov 10-0.155-0.052
Nov 9-0.103-0.001
Nov 8-0.103+0.001
Nov 7-0.104+0.001
Nov 6-0.105-0.012
Nov 5-0.092-0.012
Nov 4-0.080-0.006
Nov 3-0.074+0.020
Nov 2-0.094-0.012
Nov 1-0.082+0.071
Oct 31-0.153-0.016
Oct 30-0.137-0.042
Oct 29-0.094—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Transwestern Pipeline

Transwestern PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Transwestern Pipeline · posted 2026-09-12 · effective 2026-09-11 · restoration
Transwestern Pipeline is posting Revision 1 of its GCX Waha (POI 100744) force majeure, declaring maintenance complete. The emergency valve repair that reduced delivery capacity from 0.250 Bcf/d to zero effective Gas Day September 11 Intraday 3 has been resolved, with full capaci…
Transwestern Pipeline · posted 2026-09-12 · effective 2026-09-11 · force majeure
Transwestern Pipeline declared force majeure at the GCX Waha interconnect (POI 100744) effective September 11, 2026 at 4:02 PM, reducing delivery capacity from 0.250 Bcf/d to zero due to emergency valve repair. Restoration to full 0.250 Bcf/d capacity is scheduled for September 1…
Transwestern Pipeline · posted 2026-09-12 · effective 2026-09-12 · force majeure
Transwestern Pipeline declared force majeure at the GCX WAHA interconnect (loc 100744) effective Sep 12, 2026 9:00AM through Sep 13, 2026 8:59AM -- a one-day event. The capacity table for the prior gas day (Sep 11) shows GCX WAHA posting zero operating capacity against 0.027 Bcf/…
Recent notices on Transwestern Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transwestern Pipeline notices →

Transwestern Pipeline · posted 2026-11-19 · effective 2026-11-19 · force majeure
Transwestern Pipeline declared force majeure effective November 19, 2026 at 7:15AM due to a compressor station mechanical failure on the West Texas Lateral. Lateral capacity is reduced from 0.830 Bcf/d to 0.750 Bcf/d, a net cut of 0.080 Bcf/d, through November 21, 2026 at 8:59AM.…
Transwestern Pipeline · posted 2026-11-17 · effective 2026-11-14 · informational
Transwestern Pipeline · posted 2026-11-16 · effective 2026-11-14 · force majeure
Transwestern Pipeline has extended its Force Majeure at the WT-0 Compressor Station (Hagerman, NM) from the originally posted single-day event (Gas Day Nov 15 only) through Gas Day November 17, 2026, now spanning three gas days. The mechanical failure reduces West Texas Lateral c…
Transwestern Pipeline · posted 2026-11-15 · effective 2026-11-14 · force majeure
Transwestern Pipeline declared a force majeure on Gas Day November 15, 2026 due to a mechanical failure at the WT-0 Compressor Station in Hagerman, NM, reducing West Texas Lateral capacity from 830,000 MMBtu/d (0.830 Bcf/d) to approximately 750,000 MMBtu/d (0.750 Bcf/d), a net cu…
Transwestern Pipeline · posted 2026-11-04 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27 due to compressor station mechanical failure, has been extended again through Nov 9, 2026 (Revision 2). Capacity remains reduced from 750,000 MMBtu/d to 630,000 MMBtu/d (0.120 Bcf/d net cut), with restoration no…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-11-03 · force majeure
Transwestern Pipeline declared a force majeure due to a compressor station mechanical failure west of Thoreau, reducing westbound capacity from 1.240 Bcf/d to 1.100 Bcf/d (a net cut of 0.140 Bcf/d) effective Gas Day November 3, 2026. The restriction is expected to remain in effec…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27, has been extended through November 5, 2026 (was Nov 3). East Mainline capacity remains restricted from 750,000 MMBtu/d to 630,000 MMBtu/d, a net reduction of 0.120 Bcf/d. Restoration to full 0.750 Bcf/d capacit…
Transwestern Pipeline · posted 2026-10-28 · effective 2026-10-24 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, GCX WAHA (Transwestern Pipeline loc 100744) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tw/100744/