Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

TPC / Heartwell RD Plant Adams

Trailblazer Pipeline (TPC) · Loc 60487 · ADAMS, Nebraska
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.004
Bcf/d scheduled
Δ Day-over-day
+0.004
vs Nov 25
7-day average
0.001
Bcf/d
30-day average
0.000
30 of 30 days posted
30-day high
0.004
Nov 26
30-day low
0.000
Nov 20
Operating capacity
0.008
Bcf/d as posted, evening cycle
Utilization
52%
headroom 48%

Scheduled quantities as posted by Trailblazer Pipeline (TPC) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0020.0040.006Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.004+0.004
Nov 250.000+0.000
Nov 240.000+0.000
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000+0.000
Nov 200.000+0.000
Nov 190.000+0.000
Nov 180.000+0.000
Nov 170.000+0.000
Nov 160.000+0.000
Nov 150.000+0.000
Nov 140.000+0.000
Nov 130.000+0.000
Nov 120.000+0.000
Nov 110.000+0.000
Nov 100.000+0.000
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000+0.000
Nov 60.000+0.000
Nov 50.000+0.000
Nov 40.000+0.000
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000+0.000
Oct 280.000—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
TPC / Heartwell RD Plant Adams

Placed at the center of Adams, NE — approximate; the exact meter site is not published.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

SEV 1/5[Trailblazer Pipeline (TPC)] [FORCE MAJEURE] HEARTWELL LOCATION FORCE MAJEURE LOCATION (60487) - LIFTED
Tallgrass Energy · posted 2026-11-16 · effective 2026-11-16 · informational
Tallgrass Energy · posted 2026-09-02 · effective 2026-09-02 · force majeure
Trailblazer Pipeline declared a force majeure at its Heartwell Location (Location 60487) on Gas Day September 2, 2026, caused by electrical storms. Effective the ID2 cycle on September 2 and the Timely cycle on September 3, operating capacity at Heartwell is scheduled to 0 MDth/d…
Recent notices on Trailblazer Pipeline (TPC)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.

SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, TPC / Heartwell RD Plant Adams (Trailblazer Pipeline (TPC) loc 60487) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/trailblazer-pipeline-tpc/60487/