Gas day Nov 26
0.004
Bcf/d scheduled
Δ Day-over-day
+0.004
vs Nov 25
7-day average
0.001
Bcf/d
30-day average
0.000
30 of 30 days posted
30-day high
0.004
Nov 26
30-day low
0.000
Nov 20
Operating capacity
0.008
Bcf/d as posted, evening cycle
Utilization
52%
headroom 48%
Scheduled quantities as posted by Trailblazer Pipeline (TPC) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.004 | +0.004 |
| Nov 25 | 0.000 | +0.000 |
| Nov 24 | 0.000 | +0.000 |
| Nov 23 | 0.000 | +0.000 |
| Nov 22 | 0.000 | +0.000 |
| Nov 21 | 0.000 | +0.000 |
| Nov 20 | 0.000 | +0.000 |
| Nov 19 | 0.000 | +0.000 |
| Nov 18 | 0.000 | +0.000 |
| Nov 17 | 0.000 | +0.000 |
| Nov 16 | 0.000 | +0.000 |
| Nov 15 | 0.000 | +0.000 |
| Nov 14 | 0.000 | +0.000 |
| Nov 13 | 0.000 | +0.000 |
| Nov 12 | 0.000 | +0.000 |
| Nov 11 | 0.000 | +0.000 |
| Nov 10 | 0.000 | +0.000 |
| Nov 9 | 0.000 | +0.000 |
| Nov 8 | 0.000 | +0.000 |
| Nov 7 | 0.000 | +0.000 |
| Nov 6 | 0.000 | +0.000 |
| Nov 5 | 0.000 | +0.000 |
| Nov 4 | 0.000 | +0.000 |
| Nov 3 | 0.000 | +0.000 |
| Nov 2 | 0.000 | +0.000 |
| Nov 1 | 0.000 | +0.000 |
| Oct 31 | 0.000 | +0.000 |
| Oct 30 | 0.000 | +0.000 |
| Oct 29 | 0.000 | +0.000 |
| Oct 28 | 0.000 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Placed at the center of Adams, NE — approximate; the exact meter site is not published.
Notices
Notices that name this point
Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.
SEV 1/5[Trailblazer Pipeline (TPC)] [FORCE MAJEURE] HEARTWELL LOCATION FORCE MAJEURE LOCATION (60487) - LIFTED
Tallgrass Energy · posted 2026-11-16 · effective 2026-11-16 · informational
SEV 4/5[Trailblazer Pipeline (TPC)] [FORCE MAJEURE] HEARTWELL LOCATION FORCE MAJEURE LOCATION (60487)
Tallgrass Energy · posted 2026-09-02 · effective 2026-09-02 · force majeure
Trailblazer Pipeline declared a force majeure at its Heartwell Location (Location 60487) on Gas Day September 2, 2026, caused by electrical storms. Effective the ID2 cycle on September 2 and the Timely cycle on September 3, operating capacity at Heartwell is scheduled to 0 MDth/d…
Recent notices on Trailblazer Pipeline (TPC)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.
SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other End Use (Industrial) meters on Trailblazer Pipeline (TPC)
- NPLF/TPC NO PLATTE LIVESTOCK FEEDER 0.000 Bcf/d
- TPC / TPCO2 Hastings Chief Heartwell del 0.000 Bcf/d
- BHE/TPC DUONIX PLANT 0.000 Bcf/d
- TPC / TPCO2 Strang delivery 0.000 Bcf/d
Cite thisEnercast PipeScrape, TPC / Heartwell RD Plant Adams (Trailblazer Pipeline (TPC) loc 60487) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/trailblazer-pipeline-tpc/60487/