Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

TPC/Summit Hereford Ranch

Trailblazer Pipeline (TPC) · Loc 60361 · Colorado
Processing plant · counted in Supply / Production
Gas day Nov 26
0.032
Bcf/d scheduled
Δ Day-over-day
-0.004
vs Nov 25
7-day average
0.036
Bcf/d
30-day average
0.036
30 of 30 days posted
30-day high
0.042
Oct 31
30-day low
0.020
Nov 3
Operating capacity
0.053
Bcf/d as posted, evening cycle
Utilization
60%
headroom 40%

Scheduled quantities as posted by Trailblazer Pipeline (TPC) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0200.0400.060Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.032-0.004
Nov 250.036+0.002
Nov 240.034-0.003
Nov 230.037+0.000
Nov 220.037+0.000
Nov 210.037+0.000
Nov 200.037+0.002
Nov 190.035-0.000
Nov 180.035-0.001
Nov 170.036-0.001
Nov 160.037+0.000
Nov 150.037+0.000
Nov 140.037-0.000
Nov 130.037-0.002
Nov 120.039+0.000
Nov 110.039+0.000
Nov 100.039+0.002
Nov 90.037+0.000
Nov 80.037+0.000
Nov 70.037+0.001
Nov 60.036+0.003
Nov 50.033+0.000
Nov 40.033+0.013
Nov 30.020-0.017
Nov 20.037+0.000
Nov 10.037-0.005
Oct 310.042+0.000
Oct 300.042+0.003
Oct 290.039+0.003
Oct 280.036—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).

State only (Colorado) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Recent notices on Trailblazer Pipeline (TPC)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.

Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…