Gas day Nov 26
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.000
Bcf/d
30-day average
0.001
30 of 30 days posted
30-day high
0.029
Oct 28
30-day low
0.000
Nov 26
Operating capacity
0.064
Bcf/d as posted, evening cycle
Utilization
0%
headroom 100%
Scheduled quantities as posted by Trailblazer Pipeline (TPC) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.000 | +0.000 |
| Nov 25 | 0.000 | +0.000 |
| Nov 24 | 0.000 | +0.000 |
| Nov 23 | 0.000 | +0.000 |
| Nov 22 | 0.000 | +0.000 |
| Nov 21 | 0.000 | +0.000 |
| Nov 20 | 0.000 | +0.000 |
| Nov 19 | 0.000 | +0.000 |
| Nov 18 | 0.000 | +0.000 |
| Nov 17 | 0.000 | +0.000 |
| Nov 16 | 0.000 | +0.000 |
| Nov 15 | 0.000 | +0.000 |
| Nov 14 | 0.000 | +0.000 |
| Nov 13 | 0.000 | +0.000 |
| Nov 12 | 0.000 | +0.000 |
| Nov 11 | 0.000 | +0.000 |
| Nov 10 | 0.000 | +0.000 |
| Nov 9 | 0.000 | +0.000 |
| Nov 8 | 0.000 | +0.000 |
| Nov 7 | 0.000 | +0.000 |
| Nov 6 | 0.000 | +0.000 |
| Nov 5 | 0.000 | +0.000 |
| Nov 4 | 0.000 | +0.000 |
| Nov 3 | 0.000 | +0.000 |
| Nov 2 | 0.000 | +0.000 |
| Nov 1 | 0.000 | -0.005 |
| Oct 31 | 0.005 | +0.000 |
| Oct 30 | 0.005 | +0.000 |
| Oct 29 | 0.005 | -0.024 |
| Oct 28 | 0.029 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
State only (Colorado) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
Recent notices on Trailblazer Pipeline (TPC)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.
SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on Trailblazer Pipeline (TPC)
- TPC/Summit Hereford Ranch 0.032 Bcf/d