Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

INVNYLON/TGP GREENFIELD DELIVERY VI

Tennessee Gas Pipeline (TGP) · Loc 56830 · VICTORIA, Texas
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.025
Bcf/d scheduled
Δ Day-over-day
-0.008
vs Nov 25
7-day average
0.024
Bcf/d
30-day average
0.024
30 of 30 days posted
30-day high
0.043
Nov 17
30-day low
0.007
Oct 29
Operating capacity
0.092
Bcf/d as posted, evening cycle
Utilization
27%
headroom 73%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0200.0400.060Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.025-0.008
Nov 250.032+0.009
Nov 240.023+0.003
Nov 230.020-0.001
Nov 220.021+0.000
Nov 210.021-0.004
Nov 200.025+0.000
Nov 190.025-0.005
Nov 180.030-0.013
Nov 170.043+0.021
Nov 160.022-0.001
Nov 150.023+0.000
Nov 140.023+0.000
Nov 130.023-0.003
Nov 120.026-0.001
Nov 110.027+0.002
Nov 100.025+0.003
Nov 90.022-0.001
Nov 80.023+0.000
Nov 70.023-0.002
Nov 60.025+0.000
Nov 50.025+0.000
Nov 40.025+0.000
Nov 30.025+0.014
Nov 20.011-0.005
Nov 10.016-0.011
Oct 310.027+0.000
Oct 300.027+0.020
Oct 290.007-0.018
Oct 280.025—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineINVNYLON/TGP GREENFIELD DELIVERY VI

Tennessee Gas PipelinePlaced at the center of Victoria, TX — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, INVNYLON/TGP GREENFIELD DELIVERY VI (Tennessee Gas Pipeline (TGP) loc 56830) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/56830/