Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

BBTMISS/TGP ENDEVCO SUNRISE SALES F

Tennessee Gas Pipeline (TGP) · Loc 420641 · FORREST, Mississippi
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 27
0.003
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.003
Bcf/d
30-day average
0.003
30 of 30 days posted
30-day high
0.005
Nov 23
30-day low
0.003
Nov 27
Operating capacity
0.026
Bcf/d as posted, evening cycle
Utilization
10%
headroom 90%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0020.0040.006Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.003+0.000
Nov 260.003-0.001
Nov 250.004+0.001
Nov 240.003-0.003
Nov 230.005+0.003
Nov 220.003+0.000
Nov 210.003+0.000
Nov 200.003+0.000
Nov 190.003+0.000
Nov 180.003+0.000
Nov 170.003-0.000
Nov 160.003+0.000
Nov 150.003+0.000
Nov 140.003+0.000
Nov 130.003+0.000
Nov 120.003+0.000
Nov 110.003+0.000
Nov 100.003-0.002
Nov 90.004+0.002
Nov 80.003+0.000
Nov 70.003-0.000
Nov 60.003+0.000
Nov 50.003+0.000
Nov 40.003+0.000
Nov 30.003+0.000
Nov 20.003+0.000
Nov 10.003+0.000
Oct 310.003+0.000
Oct 300.003+0.000
Oct 290.003—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineBBTMISS/TGP ENDEVCO SUNRISE SALES F

Tennessee Gas PipelinePlaced at the center of Forrest, MS — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, BBTMISS/TGP ENDEVCO SUNRISE SALES F (Tennessee Gas Pipeline (TGP) loc 420641) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420641/