TGP -- CENAGAS/PEMEX south delivery

Tennessee Gas Pipeline (TGP) · Loc 450261 · South Texas
Mexico border crossing · counted in Mexico Exports
Gas day Nov 27
0.233
Bcf/d scheduled
Δ Day-over-day
+0.003
vs Nov 26
7-day average
0.194
Bcf/d
30-day average
0.189
30 of 30 days posted
30-day high
0.242
Nov 4
30-day low
0.059
Nov 14
Operating capacity
0.480
Bcf/d as posted, evening cycle
Utilization
49%
headroom 51%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Shown as a positive export volume. Same figure as this meter’s row on the Mexico Exports page.

0.000.100.200.30Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.233+0.003
Nov 260.230+0.001
Nov 250.229-0.001
Nov 240.230+0.035
Nov 230.195+0.074
Nov 220.121+0.000
Nov 210.121-0.007
Nov 200.128-0.091
Nov 190.219+0.001
Nov 180.218+0.007
Nov 170.210+0.076
Nov 160.135+0.068
Nov 150.067+0.009
Nov 140.059-0.152
Nov 130.210-0.006
Nov 120.216-0.001
Nov 110.217+0.011
Nov 100.206+0.009
Nov 90.197-0.007
Nov 80.204+0.018
Nov 70.186-0.040
Nov 60.226-0.005
Nov 50.231-0.011
Nov 40.242+0.010
Nov 30.232+0.051
Nov 20.182+0.033
Nov 10.148-0.051
Oct 310.199+0.023
Oct 300.176-0.023
Oct 290.198—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Tennessee Gas Pipeline (TGP) · posted 2026-11-17 · effective 2026-11-18 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-02 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-10-07 · effective 2026-10-06 · restoration
Tennessee Gas Pipeline has resolved the force majeure declared October 6, 2026 on Line 1 between STA 409A-101 and MLV 409A-103 (Segment 490FH) near the Alamo Compressor Station in Hidalgo County, TX. The Rio Bravo Delivery Meter (421017) and the Cenagas Delivery Meter (450261) we…
Tennessee Gas Pipeline (TGP) · posted 2026-10-05 · effective 2026-10-06
Tennessee Gas Pipeline (TGP) · posted 2026-09-23 · effective 2026-09-24 · informational
Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, TGP -- CENAGAS/PEMEX south delivery (Tennessee Gas Pipeline (TGP) loc 450261) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/450261/