Gas day Nov 27
0.233
Bcf/d scheduled
Δ Day-over-day
+0.003
vs Nov 26
7-day average
0.194
Bcf/d
30-day average
0.189
30 of 30 days posted
30-day high
0.242
Nov 4
30-day low
0.059
Nov 14
Operating capacity
0.480
Bcf/d as posted, evening cycle
Utilization
49%
headroom 51%
Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Shown as a positive export volume. Same figure as this meter’s row on the Mexico Exports page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.233 | +0.003 |
| Nov 26 | 0.230 | +0.001 |
| Nov 25 | 0.229 | -0.001 |
| Nov 24 | 0.230 | +0.035 |
| Nov 23 | 0.195 | +0.074 |
| Nov 22 | 0.121 | +0.000 |
| Nov 21 | 0.121 | -0.007 |
| Nov 20 | 0.128 | -0.091 |
| Nov 19 | 0.219 | +0.001 |
| Nov 18 | 0.218 | +0.007 |
| Nov 17 | 0.210 | +0.076 |
| Nov 16 | 0.135 | +0.068 |
| Nov 15 | 0.067 | +0.009 |
| Nov 14 | 0.059 | -0.152 |
| Nov 13 | 0.210 | -0.006 |
| Nov 12 | 0.216 | -0.001 |
| Nov 11 | 0.217 | +0.011 |
| Nov 10 | 0.206 | +0.009 |
| Nov 9 | 0.197 | -0.007 |
| Nov 8 | 0.204 | +0.018 |
| Nov 7 | 0.186 | -0.040 |
| Nov 6 | 0.226 | -0.005 |
| Nov 5 | 0.231 | -0.011 |
| Nov 4 | 0.242 | +0.010 |
| Nov 3 | 0.232 | +0.051 |
| Nov 2 | 0.182 | +0.033 |
| Nov 1 | 0.148 | -0.051 |
| Oct 31 | 0.199 | +0.023 |
| Oct 30 | 0.176 | -0.023 |
| Oct 29 | 0.198 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Tennessee Gas PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.
Notices
Notices that name this point
Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.
Tennessee Gas Pipeline (TGP) · posted 2026-11-17 · effective 2026-11-18 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-02 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-10-07 · effective 2026-10-06 · restoration
Tennessee Gas Pipeline has resolved the force majeure declared October 6, 2026 on Line 1 between STA 409A-101 and MLV 409A-103 (Segment 490FH) near the Alamo Compressor Station in Hidalgo County, TX. The Rio Bravo Delivery Meter (421017) and the Cenagas Delivery Meter (450261) we…
Tennessee Gas Pipeline (TGP) · posted 2026-10-05 · effective 2026-10-06
Tennessee Gas Pipeline (TGP) · posted 2026-09-23 · effective 2026-09-24 · informational
Recent notices on Tennessee Gas Pipeline (TGP)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →
Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Mexico Exports meters on Tennessee Gas Pipeline (TGP)
- TGP -- Rio Bravo (Hidalgo Co. crossing) 0.237 Bcf/d
Cite thisEnercast PipeScrape, TGP -- CENAGAS/PEMEX south delivery (Tennessee Gas Pipeline (TGP) loc 450261) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/450261/