Enercast — at the moment it matters
Home / Daily Summary / Mexico Exports / Meter

TGP -- Rio Bravo (Hidalgo Co. crossing)

Tennessee Gas Pipeline (TGP) · Loc 421017 · South Texas
Mexico border crossing · counted in Mexico Exports
Gas day Nov 26
0.266
Bcf/d scheduled
Δ Day-over-day
-0.018
vs Nov 25
7-day average
0.229
Bcf/d
30-day average
0.243
30 of 30 days posted
30-day high
0.283
Nov 25
30-day low
0.126
Nov 21
Operating capacity
0.430
Bcf/d as posted, evening cycle
Utilization
62%
headroom 38%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Shown as a positive export volume. Same figure as this meter’s row on the Mexico Exports page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.266-0.018
Nov 250.283+0.006
Nov 240.277+0.010
Nov 230.267+0.137
Nov 220.130+0.004
Nov 210.126-0.130
Nov 200.257-0.015
Nov 190.272+0.018
Nov 180.254-0.008
Nov 170.262+0.008
Nov 160.254+0.009
Nov 150.244-0.022
Nov 140.266+0.015
Nov 130.251-0.015
Nov 120.266-0.009
Nov 110.275+0.013
Nov 100.262-0.001
Nov 90.263+0.026
Nov 80.237-0.007
Nov 70.244-0.022
Nov 60.266+0.003
Nov 50.263+0.015
Nov 40.247+0.028
Nov 30.219-0.008
Nov 20.228+0.004
Nov 10.224-0.000
Oct 310.224-0.008
Oct 300.231+0.014
Oct 290.217+0.000
Oct 280.217—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Tennessee Gas Pipeline (TGP) · posted 2026-11-02 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-10-07 · effective 2026-10-06 · restoration
Tennessee Gas Pipeline has resolved the force majeure declared October 6, 2026 on Line 1 between STA 409A-101 and MLV 409A-103 (Segment 490FH) near the Alamo Compressor Station in Hidalgo County, TX. The Rio Bravo Delivery Meter (421017) and the Cenagas Delivery Meter (450261) we…
Tennessee Gas Pipeline (TGP) · posted 2026-10-05 · effective 2026-10-06
Tennessee Gas Pipeline (TGP) · posted 2026-09-24 · informational
Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, TGP -- Rio Bravo (Hidalgo Co. crossing) (Tennessee Gas Pipeline (TGP) loc 421017) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/421017/