Eastman Chemical/TXO-Callahan Rd., Harrison Co., TX

Texas Eastern Transmission (TETCO) · Loc 73896 · HARRISON, Texas
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.017
Bcf/d scheduled
Δ Day-over-day
-0.013
vs Nov 25
7-day average
0.028
Bcf/d
30-day average
0.022
30 of 30 days posted
30-day high
0.031
Nov 24
30-day low
0.007
Nov 17
Operating capacity
0.102
Bcf/d as posted, late_0005 cycle
Utilization
17%
headroom 83%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0100.0200.0300.040Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.017-0.013
Nov 250.030-0.001
Nov 240.031+0.001
Nov 230.030+0.000
Nov 220.030+0.000
Nov 210.030+0.000
Nov 200.030+0.003
Nov 190.027+0.005
Nov 180.022+0.015
Nov 170.007+0.000
Nov 160.007+0.000
Nov 150.007+0.000
Nov 140.007-0.023
Nov 130.030+0.003
Nov 120.027+0.000
Nov 110.027+0.020
Nov 100.007+0.000
Nov 90.007+0.000
Nov 80.007+0.000
Nov 70.007-0.021
Nov 60.028+0.000
Nov 50.028+0.000
Nov 40.028+0.000
Nov 30.028+0.000
Nov 20.028+0.000
Nov 10.028-0.000
Oct 310.028+0.000
Oct 300.028-0.002
Oct 290.030+0.000
Oct 280.030—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)Eastman Chemical/TXO-Callahan Rd., Harrison Co., TX

Texas Eastern (TETCO)Placed at the center of Harrison, TX — approximate; the exact meter site is not published.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Eastman Chemical/TXO-Callahan Rd., Harrison Co., TX (Texas Eastern Transmission (TETCO) loc 73896) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tetco/73896/