Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

Paulsboro Refinery

Texas Eastern Transmission (TETCO) · Loc 73127 · PHILADELPHIA, Pennsylvania
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 27
0.050
Bcf/d scheduled
Δ Day-over-day
+0.010
vs Nov 26
7-day average
0.042
Bcf/d
30-day average
0.043
30 of 30 days posted
30-day high
0.064
Nov 13
30-day low
0.034
Nov 8
Operating capacity
0.061
Bcf/d as posted, late_0005 cycle
Utilization
82%
headroom 18%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.050+0.010
Nov 260.040-0.009
Nov 250.049+0.005
Nov 240.044+0.006
Nov 230.038+0.003
Nov 220.035-0.001
Nov 210.036-0.010
Nov 200.045-0.001
Nov 190.046-0.001
Nov 180.046-0.003
Nov 170.049-0.005
Nov 160.054+0.006
Nov 150.048+0.000
Nov 140.048-0.015
Nov 130.064+0.010
Nov 120.053+0.012
Nov 110.041+0.001
Nov 100.040-0.001
Nov 90.041+0.007
Nov 80.034+0.000
Nov 70.034+0.000
Nov 60.034-0.001
Nov 50.035+0.001
Nov 40.034-0.003
Nov 30.037+0.001
Nov 20.036+0.000
Nov 10.036-0.007
Oct 310.043+0.000
Oct 300.043-0.003
Oct 290.045—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)Paulsboro Refinery

Texas Eastern (TETCO)Placed at the center of Philadelphia, PA — approximate; the exact meter site is not published.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Paulsboro Refinery (Texas Eastern Transmission (TETCO) loc 73127) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/73127/