Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Empire Energy Center

Southern Star · Loc 378502
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.021
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.014
Bcf/d
30-day average
0.006
30 of 30 days posted
30-day high
0.021
Nov 27
30-day low
0.002
Nov 1
Operating capacity
0.124
Bcf/d as posted, evening cycle
Utilization
17%
headroom 83%

Scheduled quantities as posted by Southern Star on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0100.0200.030Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.021+0.000
Nov 260.021+0.000
Nov 250.021+0.006
Nov 240.016+0.009
Nov 230.007+0.000
Nov 220.007+0.000
Nov 210.007+0.005
Nov 200.002-0.004
Nov 190.006-0.002
Nov 180.008-0.005
Nov 170.013+0.010
Nov 160.003+0.000
Nov 150.003+0.000
Nov 140.003+0.000
Nov 130.003+0.001
Nov 120.002+0.000
Nov 110.002-0.004
Nov 100.006+0.004
Nov 90.002+0.000
Nov 80.002+0.000
Nov 70.002+0.000
Nov 60.002+0.000
Nov 50.002+0.000
Nov 40.002+0.000
Nov 30.002+0.000
Nov 20.002+0.000
Nov 10.002-0.000
Oct 310.002+0.000
Oct 300.002+0.000
Oct 290.002—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Southern StarEmpire Energy Center

Southern StarPlant location from EIA Form 860 (plant 6223).

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Southern Star · posted 2026-10-19 · effective 2026-10-19 · force majeure
Southern Star has declared a force majeure at the Saginaw Compressor Station (Jasper County, MO) due to a mechanical failure of the Saginaw Turbine, reducing capacity by 180,000 Dth/d (0.180 Bcf/d) at Saginaw CS and 25,000 Dth/d (0.025 Bcf/d) at Empire Energy Center, totaling 0.2…
Southern Star · posted 2026-10-12 · effective 2026-10-12 · force majeure
Southern Star declared force majeure on Line Segment 455 due to a mechanical turbine failure at Saginaw Compressor Station in Jasper County, Missouri, effective October 9, 2026 (ID2 cycle). Capacity reductions total 205,000 Dth/d (0.205 Bcf/d): 180,000 Dth/d at Saginaw CS (Locati…
Southern Star · posted 2026-10-09 · effective 2026-10-09 · force majeure
Southern Star declared force majeure effective October 9, 2026 due to a mechanical failure at Saginaw Compressor Station in Jasper County, Missouri. The event reduces capacity by 180,000 Dth/d (0.180 Bcf/d) at Saginaw CS (Location ID 444550) and 25,000 Dth/d (0.025 Bcf/d) at Empi…
Recent notices on Southern Star

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Southern Star notices →

Southern Star · posted 2026-11-07 · effective 2026-11-06 · informational
Southern Star · posted 2026-11-05 · effective 2026-11-05 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Empire Energy Center (Southern Star loc 378502) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/southernstar/378502/