Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.001
Bcf/d
30-day average
0.001
30 of 30 days posted
30-day high
0.006
Nov 12
30-day low
0.000
Nov 27
Operating capacity
0.051
Bcf/d as posted, evening cycle
Utilization
0%
headroom 100%
Scheduled quantities as posted by Southern Star on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.000 | +0.000 |
| Nov 26 | 0.000 | +0.000 |
| Nov 25 | 0.000 | -0.004 |
| Nov 24 | 0.004 | +0.004 |
| Nov 23 | 0.000 | +0.000 |
| Nov 22 | 0.000 | +0.000 |
| Nov 21 | 0.000 | +0.000 |
| Nov 20 | 0.000 | +0.000 |
| Nov 19 | 0.000 | +0.000 |
| Nov 18 | 0.000 | +0.000 |
| Nov 17 | 0.000 | +0.000 |
| Nov 16 | 0.000 | +0.000 |
| Nov 15 | 0.000 | +0.000 |
| Nov 14 | 0.000 | +0.000 |
| Nov 13 | 0.000 | -0.006 |
| Nov 12 | 0.006 | +0.006 |
| Nov 11 | 0.000 | -0.003 |
| Nov 10 | 0.003 | +0.003 |
| Nov 9 | 0.000 | +0.000 |
| Nov 8 | 0.000 | +0.000 |
| Nov 7 | 0.000 | +0.000 |
| Nov 6 | 0.000 | +0.000 |
| Nov 5 | 0.000 | +0.000 |
| Nov 4 | 0.000 | +0.000 |
| Nov 3 | 0.000 | +0.000 |
| Nov 2 | 0.000 | +0.000 |
| Nov 1 | 0.000 | +0.000 |
| Oct 31 | 0.000 | +0.000 |
| Oct 30 | 0.000 | -0.002 |
| Oct 29 | 0.002 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Southern StarPlant location from EIA Form 860 (plant 58255).
Notices
Recent notices on Southern Star
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Southern Star notices →
Southern Star · posted 2026-11-07 · effective 2026-11-06 · informational
Southern Star · posted 2026-11-05 · effective 2026-11-05 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Power Generation meters on Southern Star
- Westar Emporia Energy 0.082 Bcf/d
- Gordon Evans Plant 0.048 Bcf/d
- Empire Riverton 0.046 Bcf/d
- Dogwood Energy Power Plant 0.038 Bcf/d
- Empire Energy Center 0.021 Bcf/d
- Evergy - Hawthorn Power Plant 0.015 Bcf/d
- Evergy - West Gardner 0.005 Bcf/d
- UCB Tecumseh 0.004 Bcf/d
Cite thisEnercast PipeScrape, Sunflower Electric Rubart Power Plant (Southern Star loc 17003) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/southernstar/17003/