Petal Storage (via SNG/Gulf South interconnect)

Southern Natural Gas · Loc 606200 · Gulf Coast
Storage injection / withdrawal · counted in Storage
Gas day Nov 27
+0.032
Bcf/d scheduled
Δ Day-over-day
-0.006
vs Nov 26
7-day average
+0.025
Bcf/d
30-day average
+0.041
30 of 30 days posted
30-day high
+0.080
Nov 1
30-day low
+0.003
Oct 29
Operating capacity
0.890
Bcf/d as posted, evening cycle
Utilization
4%
headroom 96%

Scheduled quantities as posted by Southern Natural Gas on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.032-0.006
Nov 26+0.038-0.003
Nov 25+0.041+0.020
Nov 24+0.021+0.007
Nov 23+0.014-0.002
Nov 22+0.016+0.002
Nov 21+0.014+0.004
Nov 20+0.011-0.007
Nov 19+0.018-0.018
Nov 18+0.036+0.025
Nov 17+0.011-0.048
Nov 16+0.059+0.000
Nov 15+0.059+0.000
Nov 14+0.059+0.016
Nov 13+0.043-0.034
Nov 12+0.077-0.000
Nov 11+0.077+0.012
Nov 10+0.066-0.010
Nov 9+0.076+0.007
Nov 8+0.069+0.042
Nov 7+0.027+0.009
Nov 6+0.018-0.015
Nov 5+0.033-0.045
Nov 4+0.078+0.049
Nov 3+0.029-0.032
Nov 2+0.062-0.018
Nov 1+0.080+0.040
Oct 31+0.040+0.010
Oct 30+0.030+0.027
Oct 29+0.003—
70 more days on file for this meter, back to August 20, 2026. Full meter-level history is part of Institutional (API and downloads).
Southern Natural Gas

Southern Natural GasExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Southern Natural Gas

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Southern Natural Gas notices →

Southern Natural Gas · posted 2026-11-23 · effective 2026-11-23 · informational
Southern Natural Gas · posted 2026-11-23 · effective 2026-11-22 · force majeure
Southern Natural Gas declared force majeure effective gas day November 22, 2026 due to an unscheduled pipeline outage on the South Main Loop Line east of the York compressor station (Segment 440, Zone 1/2 S Boundary) in Sumter County, AL. Capacity on Segment 440 is reduced by 500…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Petal Storage (via SNG/Gulf South interconnect) (Southern Natural Gas loc 606200) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/sng/606200/