Enercast — at the moment it matters
Home / Daily Summary / Storage / Meter

Bear Creek (withdrawal leg)

Southern Natural Gas · Loc 405367 · Gulf Coast
Storage injection / withdrawal · counted in Storage
Gas day Nov 27
+0.024
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
+0.024
Bcf/d
30-day average
+0.024
30 of 30 days posted
30-day high
+0.030
Nov 11
30-day low
+0.018
Oct 30
Operating capacity
0.201
Bcf/d as posted, evening cycle
Utilization
12%
headroom 88%

Scheduled quantities as posted by Southern Natural Gas on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.0000.0100.0200.0300.040Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.024+0.000
Nov 26+0.024+0.001
Nov 25+0.023-0.001
Nov 24+0.024-0.001
Nov 23+0.025+0.000
Nov 22+0.025+0.000
Nov 21+0.025+0.000
Nov 20+0.025+0.005
Nov 19+0.020+0.000
Nov 18+0.020+0.000
Nov 17+0.020+0.000
Nov 16+0.020+0.000
Nov 15+0.020+0.000
Nov 14+0.020+0.000
Nov 13+0.020-0.003
Nov 12+0.023-0.007
Nov 11+0.030+0.002
Nov 10+0.028+0.002
Nov 9+0.026-0.004
Nov 8+0.030+0.000
Nov 7+0.030+0.000
Nov 6+0.030+0.000
Nov 5+0.030+0.001
Nov 4+0.029+0.004
Nov 3+0.025+0.000
Nov 2+0.025+0.000
Nov 1+0.025+0.007
Oct 31+0.018+0.001
Oct 30+0.018-0.001
Oct 29+0.018—
70 more days on file for this meter, back to August 20, 2026. Full meter-level history is part of Institutional (API and downloads).
Southern Natural Gas

Southern Natural GasExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Southern Natural Gas · posted 2026-10-27 · effective 2026-10-27 · informational
Recent notices on Southern Natural Gas

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Southern Natural Gas notices →

Southern Natural Gas · posted 2026-11-23 · effective 2026-11-23 · informational
Southern Natural Gas · posted 2026-11-23 · effective 2026-11-22 · force majeure
Southern Natural Gas declared force majeure effective gas day November 22, 2026 due to an unscheduled pipeline outage on the South Main Loop Line east of the York compressor station (Segment 440, Zone 1/2 S Boundary) in Sumter County, AL. Capacity on Segment 440 is reduced by 500…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Bear Creek (withdrawal leg) (Southern Natural Gas loc 405367) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/sng/405367/