Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

ROSE VALLEY PLANT

Panhandle Eastern Pipe Line · Loc 41424 · Oklahoma
Processing plant · counted in Supply / Production
Gas day Nov 26
0.035
Bcf/d scheduled
Δ Day-over-day
-0.009
vs Nov 25
7-day average
0.028
Bcf/d
30-day average
0.038
30 of 30 days posted
30-day high
0.092
Oct 31
30-day low
0.011
Nov 15
Operating capacity
0.175
Bcf/d as posted, none cycle
Utilization
20%
headroom 80%

Scheduled quantities as posted by Panhandle Eastern Pipe Line on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0250.0500.0750.100Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.035-0.009
Nov 250.044+0.022
Nov 240.022+0.001
Nov 230.021-0.013
Nov 220.034+0.008
Nov 210.026+0.010
Nov 200.016-0.017
Nov 190.033-0.008
Nov 180.041+0.005
Nov 170.036+0.013
Nov 160.022+0.012
Nov 150.011+0.000
Nov 140.011-0.002
Nov 130.013-0.025
Nov 120.037+0.000
Nov 110.037-0.005
Nov 100.043+0.016
Nov 90.027-0.013
Nov 80.039+0.003
Nov 70.036+0.008
Nov 60.028-0.003
Nov 50.031-0.051
Nov 40.082+0.009
Nov 30.073+0.014
Nov 20.060+0.022
Nov 10.037-0.054
Oct 310.092+0.007
Oct 300.085+0.055
Oct 290.030-0.018
Oct 280.048—
77 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Panhandle Eastern

Panhandle EasternState only (Oklahoma) — the meter's exact site is not geocoded; the ring marks the state, not the point.

No recent notices matched or named this point, and no severity 3+ notices on Panhandle Eastern Pipe Line in the last 30 days. See all Panhandle Eastern Pipe Line notices.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ROSE VALLEY PLANT (Panhandle Eastern Pipe Line loc 41424) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/pepl/41424/