Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

WOODS COUNTY PLANT - SEMGAS

Panhandle Eastern Pipe Line · Loc 41384 · Oklahoma
Processing plant · counted in Supply / Production
Gas day Nov 27
0.105
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.103
Bcf/d
30-day average
0.092
30 of 30 days posted
30-day high
0.111
Oct 29
30-day low
0.061
Nov 4
Operating capacity
0.125
Bcf/d as posted, none cycle
Utilization
84%
headroom 16%

Scheduled quantities as posted by Panhandle Eastern Pipe Line on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.105+0.000
Nov 260.105-0.000
Nov 250.105+0.004
Nov 240.101-0.002
Nov 230.102+0.000
Nov 220.102+0.000
Nov 210.102-0.007
Nov 200.109+0.000
Nov 190.109+0.001
Nov 180.107+0.001
Nov 170.107+0.002
Nov 160.105+0.000
Nov 150.105+0.000
Nov 140.105+0.000
Nov 130.105+0.025
Nov 120.080+0.000
Nov 110.080+0.004
Nov 100.076+0.001
Nov 90.075+0.000
Nov 80.075+0.000
Nov 70.075-0.006
Nov 60.081+0.000
Nov 50.081+0.020
Nov 40.061+0.000
Nov 30.061+0.000
Nov 20.061+0.000
Nov 10.061-0.043
Oct 310.104+0.000
Oct 300.104-0.007
Oct 290.111—
78 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Panhandle Eastern

Panhandle EasternState only (Oklahoma) — the meter's exact site is not geocoded; the ring marks the state, not the point.

No recent notices matched or named this point, and no severity 3+ notices on Panhandle Eastern Pipe Line in the last 30 days. See all Panhandle Eastern Pipe Line notices.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, WOODS COUNTY PLANT - SEMGAS (Panhandle Eastern Pipe Line loc 41384) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/pepl/41384/