Gas day Nov 26
0.046
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.046
Bcf/d
30-day average
0.046
30 of 30 days posted
30-day high
0.056
Nov 17
30-day low
0.025
Oct 28
Operating capacity
0.100
Bcf/d as posted, late_0005 cycle
Utilization
46%
headroom 54%
Scheduled quantities as posted by NEXUS Gas Transmission (U.S.) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.046 | +0.000 |
| Nov 25 | 0.046 | +0.000 |
| Nov 24 | 0.046 | +0.000 |
| Nov 23 | 0.046 | +0.000 |
| Nov 22 | 0.046 | +0.000 |
| Nov 21 | 0.046 | -0.005 |
| Nov 20 | 0.051 | +0.000 |
| Nov 19 | 0.051 | +0.005 |
| Nov 18 | 0.046 | -0.010 |
| Nov 17 | 0.056 | +0.000 |
| Nov 16 | 0.056 | +0.000 |
| Nov 15 | 0.056 | +0.000 |
| Nov 14 | 0.056 | +0.000 |
| Nov 13 | 0.056 | +0.000 |
| Nov 12 | 0.056 | +0.000 |
| Nov 11 | 0.056 | +0.005 |
| Nov 10 | 0.051 | +0.000 |
| Nov 9 | 0.051 | +0.000 |
| Nov 8 | 0.051 | +0.000 |
| Nov 7 | 0.051 | +0.000 |
| Nov 6 | 0.051 | +0.000 |
| Nov 5 | 0.051 | +0.004 |
| Nov 4 | 0.046 | +0.011 |
| Nov 3 | 0.035 | -0.001 |
| Nov 2 | 0.036 | +0.000 |
| Nov 1 | 0.036 | +0.011 |
| Oct 31 | 0.026 | +0.000 |
| Oct 30 | 0.026 | -0.010 |
| Oct 29 | 0.036 | +0.010 |
| Oct 28 | 0.025 | — |
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
NEXUS Gas TransmissionState only (Ohio) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
Recent notices on NEXUS Gas Transmission (U.S.)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All NEXUS Gas Transmission (U.S.) notices →
NEXUS Gas Transmission (U.S.) · posted 2026-11-25 · effective 2026-11-25 · informational
SEV 4/5Nexus Force Majeure
NEXUS Gas Transmission (U.S.) · posted 2026-11-18 · effective 2026-11-18 · force majeure
NEXUS Gas Transmission declared force majeure effective November 14, 2026, due to an unplanned outage at the N1002 - NEXUS/DEO MR05 meter station. Restoration timeline is unknown. No capacity volume figure is provided in the notice, so the magnitude of the flow impact is unquanti…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on NEXUS Gas Transmission (U.S.)
- NEXUS/KENSINGTON MR02 0.292 Bcf/d
- MARK WEST - MAJORSVILLE, MARSHALL CO., WVA 0.144 Bcf/d
- M-3 MIDSTREAM/HIGH NOON 0.139 Bcf/d
- WILLIAMS OHIO VALLEY MIDSTREAM LLC.-GOSNEY HILL ROAD, MARSH 0.126 Bcf/d
- RICE ENERGY-BAMBINO, MCCLELLAN AVE., GREENE CO., PA 0.103 Bcf/d
- CNX - MCQUAY III - CONE GATHERING, GREENE CO., PA. 0.051 Bcf/d
- Nexus/North Coast Transmision Del -0.006 Bcf/d
- (DTE) NEXUS - YPSILANTI RECEIPT 0.005 Bcf/d
Cite thisEnercast PipeScrape, BLUE RACER MIDSTREAM-BERNE, MONROE CO.,OH (NEXUS Gas Transmission (U.S.) loc N4732) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/nexus/n4732/