Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Astoria

Northern Border Pipeline (NBPL) · Loc ASTO
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.007
Bcf/d
30-day average
0.007
30 of 30 days posted
30-day high
0.025
Nov 24
30-day low
0.000
Nov 27
Operating capacity
0.075
Bcf/d as posted, timely cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Northern Border Pipeline (NBPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0100.0200.030Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000+0.000
Nov 260.000-0.024
Nov 250.024-0.001
Nov 240.025+0.025
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000-0.007
Nov 200.007+0.007
Nov 190.000+0.000
Nov 180.000-0.006
Nov 170.006+0.006
Nov 160.000+0.000
Nov 150.000+0.000
Nov 140.000-0.024
Nov 130.024+0.024
Nov 120.000-0.010
Nov 110.010-0.003
Nov 100.013+0.013
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000-0.023
Nov 60.023+0.023
Nov 50.000+0.000
Nov 40.000-0.007
Nov 30.007+0.007
Nov 20.000+0.000
Nov 10.000-0.017
Oct 310.017-0.006
Oct 300.023+0.002
Oct 290.021—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Northern Border PipelineAstoria

Northern Border PipelinePlant location from EIA Form 860 (plant 61144).

Recent notices on Northern Border Pipeline (NBPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northern Border Pipeline (NBPL) notices →

Northern Border Pipeline (NBPL) · posted 2026-11-25 · informational
Northern Border Pipeline (NBPL) · posted 2026-11-24 · informational
Northern Border Pipeline (NBPL) · posted 2026-11-20 · effective 2026-11-20 · informational
Northern Border Pipeline (NBPL) · posted 2026-11-04 · effective 2026-11-03 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Astoria (Northern Border Pipeline (NBPL) loc ASTO) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/nbpl/asto/