Gas day Nov 27
0.064
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.067
Bcf/d
30-day average
0.065
30 of 30 days posted
30-day high
0.068
Nov 24
30-day low
0.060
Nov 10
Operating capacity
0.150
Bcf/d as posted, timely cycle
Utilization
42%
headroom 58%
Scheduled quantities as posted by MountainWest Pipelines on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.064 | +0.000 |
| Nov 26 | 0.064 | -0.003 |
| Nov 25 | 0.067 | -0.002 |
| Nov 24 | 0.068 | +0.000 |
| Nov 23 | 0.068 | +0.000 |
| Nov 22 | 0.068 | +0.000 |
| Nov 21 | 0.068 | +0.000 |
| Nov 20 | 0.068 | +0.000 |
| Nov 19 | 0.068 | +0.000 |
| Nov 18 | 0.068 | +0.003 |
| Nov 17 | 0.066 | +0.001 |
| Nov 16 | 0.065 | +0.000 |
| Nov 15 | 0.065 | +0.000 |
| Nov 14 | 0.065 | +0.000 |
| Nov 13 | 0.065 | +0.000 |
| Nov 12 | 0.065 | +0.000 |
| Nov 11 | 0.065 | +0.004 |
| Nov 10 | 0.060 | -0.003 |
| Nov 9 | 0.063 | +0.000 |
| Nov 8 | 0.063 | +0.000 |
| Nov 7 | 0.063 | -0.001 |
| Nov 6 | 0.064 | +0.000 |
| Nov 5 | 0.064 | +0.000 |
| Nov 4 | 0.064 | +0.000 |
| Nov 3 | 0.064 | -0.001 |
| Nov 2 | 0.065 | +0.000 |
| Nov 1 | 0.065 | +0.004 |
| Oct 31 | 0.060 | +0.000 |
| Oct 30 | 0.060 | +0.000 |
| Oct 29 | 0.060 | — |
82 more days on file for this meter, back to August 8, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Questar PipelineState only (Utah) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
No recent notices matched or named this point, and no severity 3+ notices on MountainWest Pipelines in the last 30 days. See all MountainWest Pipelines notices.
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on MountainWest Pipelines
- MEEKER PLANT INTRCNT 0.603 Bcf/d
- MAGNOLIA 0.355 Bcf/d
- RED WASH - FIDLAR 0.245 Bcf/d
- CHIPETA PROCESSING (REC) 0.216 Bcf/d
- OPAL PROCESSING PLANT 0.119 Bcf/d
- VERMILLION PLT OUT 0.097 Bcf/d
- PIONEER PROCESSING PLT 0.040 Bcf/d
- CO2 PLT OUTLET 0.038 Bcf/d
Cite thisEnercast PipeScrape, WELLS DRAW (MountainWest Pipelines loc 458) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/mountainwest/458/