Gas day Nov 27
0.603
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.601
Bcf/d
30-day average
0.572
30 of 30 days posted
30-day high
0.650
Nov 7
30-day low
0.044
Nov 16
Operating capacity
1.700
Bcf/d as posted, timely cycle
Utilization
35%
headroom 65%
Scheduled quantities as posted by MountainWest Pipelines on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.603 | +0.000 |
| Nov 26 | 0.603 | +0.007 |
| Nov 25 | 0.596 | +0.016 |
| Nov 24 | 0.580 | -0.041 |
| Nov 23 | 0.621 | +0.020 |
| Nov 22 | 0.601 | -0.002 |
| Nov 21 | 0.603 | +0.033 |
| Nov 20 | 0.570 | -0.023 |
| Nov 19 | 0.593 | +0.001 |
| Nov 18 | 0.592 | -0.012 |
| Nov 17 | 0.604 | +0.560 |
| Nov 16 | 0.044 | -0.581 |
| Nov 15 | 0.624 | +0.011 |
| Nov 14 | 0.613 | -0.010 |
| Nov 13 | 0.624 | +0.023 |
| Nov 12 | 0.600 | -0.001 |
| Nov 11 | 0.601 | -0.043 |
| Nov 10 | 0.644 | -0.004 |
| Nov 9 | 0.647 | +0.012 |
| Nov 8 | 0.635 | -0.014 |
| Nov 7 | 0.650 | +0.031 |
| Nov 6 | 0.619 | +0.011 |
| Nov 5 | 0.608 | +0.010 |
| Nov 4 | 0.599 | -0.003 |
| Nov 3 | 0.602 | +0.125 |
| Nov 2 | 0.477 | +0.014 |
| Nov 1 | 0.463 | -0.039 |
| Oct 31 | 0.502 | -0.030 |
| Oct 30 | 0.532 | +0.022 |
| Oct 29 | 0.511 | — |
82 more days on file for this meter, back to August 8, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Questar PipelineState only (Colorado) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
No recent notices matched or named this point, and no severity 3+ notices on MountainWest Pipelines in the last 30 days. See all MountainWest Pipelines notices.
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on MountainWest Pipelines
- MAGNOLIA 0.355 Bcf/d
- RED WASH - FIDLAR 0.245 Bcf/d
- CHIPETA PROCESSING (REC) 0.216 Bcf/d
- OPAL PROCESSING PLANT 0.119 Bcf/d
- VERMILLION PLT OUT 0.097 Bcf/d
- WELLS DRAW 0.064 Bcf/d
- PIONEER PROCESSING PLT 0.040 Bcf/d
- CO2 PLT OUTLET 0.038 Bcf/d
Cite thisEnercast PipeScrape, MEEKER PLANT INTRCNT (MountainWest Pipelines loc 40604) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/mountainwest/40604/