Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.000
Bcf/d
30-day average
0.000
30 of 30 days posted
30-day high
0.000
Nov 27
30-day low
0.000
Oct 31
Operating capacity
0.044
Bcf/d as posted, timely cycle
Utilization
1%
headroom 99%
Scheduled quantities as posted by KPC Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.000 | +0.000 |
| Nov 26 | 0.000 | +0.000 |
| Nov 25 | 0.000 | +0.000 |
| Nov 24 | 0.000 | +0.000 |
| Nov 23 | 0.000 | +0.000 |
| Nov 22 | 0.000 | +0.000 |
| Nov 21 | 0.000 | +0.000 |
| Nov 20 | 0.000 | +0.000 |
| Nov 19 | 0.000 | +0.000 |
| Nov 18 | 0.000 | +0.000 |
| Nov 17 | 0.000 | +0.000 |
| Nov 16 | 0.000 | +0.000 |
| Nov 15 | 0.000 | +0.000 |
| Nov 14 | 0.000 | +0.000 |
| Nov 13 | 0.000 | +0.000 |
| Nov 12 | 0.000 | +0.000 |
| Nov 11 | 0.000 | +0.000 |
| Nov 10 | 0.000 | +0.000 |
| Nov 9 | 0.000 | +0.000 |
| Nov 8 | 0.000 | +0.000 |
| Nov 7 | 0.000 | +0.000 |
| Nov 6 | 0.000 | +0.000 |
| Nov 5 | 0.000 | +0.000 |
| Nov 4 | 0.000 | +0.000 |
| Nov 3 | 0.000 | +0.000 |
| Nov 2 | 0.000 | +0.000 |
| Nov 1 | 0.000 | +0.000 |
| Oct 31 | 0.000 | +0.000 |
| Oct 30 | 0.000 | +0.000 |
| Oct 29 | 0.000 | — |
54 more days on file for this meter, back to September 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Placed at the center of Franklin, KS — approximate; the exact meter site is not published.
Notices
No recent notices matched or named this point, and no severity 3+ notices on KPC Pipeline in the last 30 days.
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other LDC Citygate meters on KPC Pipeline
- Goddard 0.004 Bcf/d
- K-32 0.003 Bcf/d
- Paola East (Kansas Gas Services) 0.000 Bcf/d
Cite thisEnercast PipeScrape, OTTDEL (Aggregate of Ottawa East North & South) (KPC Pipeline loc 447936) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/kpc-pipeline/447936/