Gas day Nov 26
0.004
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.002
Bcf/d
30-day average
0.003
30 of 30 days posted
30-day high
0.004
Nov 26
30-day low
0.000
Nov 23
Operating capacity
0.012
Bcf/d as posted, timely cycle
Utilization
34%
headroom 66%
Scheduled quantities as posted by KPC Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.004 | +0.000 |
| Nov 25 | 0.004 | +0.000 |
| Nov 24 | 0.004 | +0.004 |
| Nov 23 | 0.000 | +0.000 |
| Nov 22 | 0.000 | +0.000 |
| Nov 21 | 0.000 | -0.003 |
| Nov 20 | 0.003 | +0.000 |
| Nov 19 | 0.003 | +0.000 |
| Nov 18 | 0.003 | +0.000 |
| Nov 17 | 0.003 | +0.000 |
| Nov 16 | 0.003 | +0.000 |
| Nov 15 | 0.003 | +0.000 |
| Nov 14 | 0.003 | +0.000 |
| Nov 13 | 0.003 | +0.000 |
| Nov 12 | 0.003 | +0.000 |
| Nov 11 | 0.003 | +0.000 |
| Nov 10 | 0.003 | +0.000 |
| Nov 9 | 0.003 | +0.000 |
| Nov 8 | 0.003 | +0.000 |
| Nov 7 | 0.003 | +0.000 |
| Nov 6 | 0.003 | +0.000 |
| Nov 5 | 0.003 | +0.000 |
| Nov 4 | 0.003 | +0.000 |
| Nov 3 | 0.003 | +0.000 |
| Nov 2 | 0.003 | +0.000 |
| Nov 1 | 0.003 | +0.001 |
| Oct 31 | 0.002 | +0.000 |
| Oct 30 | 0.002 | +0.000 |
| Oct 29 | 0.002 | +0.000 |
| Oct 28 | 0.002 | — |
53 more days on file for this meter, back to September 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Placed at the center of Sedgwick, KS — approximate; the exact meter site is not published.
Notices
No recent notices matched or named this point, and no severity 3+ notices on KPC Pipeline in the last 30 days.
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other LDC Citygate meters on KPC Pipeline
- K-32 0.002 Bcf/d
- OTTDEL (Aggregate of Ottawa East North & South) 0.000 Bcf/d
- Paola East (Kansas Gas Services) 0.000 Bcf/d
Cite thisEnercast PipeScrape, Goddard (KPC Pipeline loc 30228) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/kpc-pipeline/30228/