Cane Island MP 1.8

Gulfstream Natural Gas System · Loc 8205224
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.010
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.011
Bcf/d
30-day average
0.011
30 of 30 days posted
30-day high
0.019
Oct 31
30-day low
0.010
Nov 27
Operating capacity
0.100
Bcf/d as posted, evening cycle
Utilization
10%
headroom 90%

Scheduled quantities as posted by Gulfstream Natural Gas System on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0050.0100.0150.020Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.010+0.000
Nov 260.010+0.000
Nov 250.010-0.005
Nov 240.015+0.005
Nov 230.010+0.000
Nov 220.010+0.000
Nov 210.010+0.000
Nov 200.010+0.000
Nov 190.010+0.000
Nov 180.010+0.000
Nov 170.010+0.000
Nov 160.010+0.000
Nov 150.010+0.000
Nov 140.010+0.000
Nov 130.010+0.000
Nov 120.010+0.000
Nov 110.010+0.000
Nov 100.010+0.000
Nov 90.010+0.000
Nov 80.010+0.000
Nov 70.010+0.000
Nov 60.010+0.000
Nov 50.010+0.000
Nov 40.010+0.000
Nov 30.010+0.000
Nov 20.010+0.000
Nov 10.010-0.009
Oct 310.019+0.002
Oct 300.017-0.002
Oct 290.019—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulfstream Natural Gas SystemCane Island MP 1.8

Gulfstream Natural Gas SystemPlant location from EIA Form 860 (plant 7238).

No recent notices matched or named this point, and no severity 3+ notices on Gulfstream Natural Gas System in the last 30 days. See all Gulfstream Natural Gas System notices.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Cane Island MP 1.8 (Gulfstream Natural Gas System loc 8205224) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfstream/8205224/