Gas day Nov 27
0.389
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.377
Bcf/d
30-day average
0.379
30 of 30 days posted
30-day high
0.460
Nov 4
30-day low
0.272
Oct 29
Operating capacity
0.642
Bcf/d as posted, evening cycle
Utilization
61%
headroom 39%
Scheduled quantities as posted by Gulfstream Natural Gas System on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.389 | +0.000 |
| Nov 26 | 0.389 | +0.016 |
| Nov 25 | 0.373 | -0.032 |
| Nov 24 | 0.405 | +0.044 |
| Nov 23 | 0.360 | +0.000 |
| Nov 22 | 0.360 | +0.000 |
| Nov 21 | 0.360 | +0.000 |
| Nov 20 | 0.360 | +0.030 |
| Nov 19 | 0.330 | -0.049 |
| Nov 18 | 0.380 | +0.025 |
| Nov 17 | 0.354 | +0.018 |
| Nov 16 | 0.337 | -0.049 |
| Nov 15 | 0.386 | +0.075 |
| Nov 14 | 0.311 | -0.082 |
| Nov 13 | 0.393 | -0.011 |
| Nov 12 | 0.403 | +0.000 |
| Nov 11 | 0.403 | -0.003 |
| Nov 10 | 0.406 | -0.004 |
| Nov 9 | 0.410 | +0.000 |
| Nov 8 | 0.410 | +0.000 |
| Nov 7 | 0.410 | +0.000 |
| Nov 6 | 0.410 | +0.061 |
| Nov 5 | 0.349 | -0.110 |
| Nov 4 | 0.460 | +0.020 |
| Nov 3 | 0.440 | +0.024 |
| Nov 2 | 0.416 | +0.002 |
| Nov 1 | 0.414 | +0.046 |
| Oct 31 | 0.368 | +0.045 |
| Oct 30 | 0.323 | +0.051 |
| Oct 29 | 0.272 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Gulfstream Natural Gas SystemPlant location from EIA Form 860 (plant 56407).
Notices
No recent notices matched or named this point, and no severity 3+ notices on Gulfstream Natural Gas System in the last 30 days. See all Gulfstream Natural Gas System notices.
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Power Generation meters on Gulfstream Natural Gas System
- FP&L Parrish Manatee MP 439.33 0.177 Bcf/d
- Peoples - Bayside MP 430.27 0.134 Bcf/d
- Duke - Osprey MP 1.34 0.080 Bcf/d
- Duke - Bartow Plant MP 418.12 0.080 Bcf/d
- Duke - Hines MP 6.3 0.071 Bcf/d
- FP&L Martin Plant MP 584.26 0.044 Bcf/d
- Duke - Tiger Bay MP 0.1 0.035 Bcf/d
- Midulla Plant (MGS) MP 2.43 0.032 Bcf/d
Cite thisEnercast PipeScrape, West County MP 34.1 (Gulfstream Natural Gas System loc 9004185) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfstream/9004185/