Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

COYOTE SPRINGS 2

Gas Transmission Northwest · Loc 314579
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.000
Bcf/d
30-day average
0.022
30 of 30 days posted
30-day high
0.053
Nov 4
30-day low
0.000
Nov 27
Operating capacity
0.058
Bcf/d as posted, id3 cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Gas Transmission Northwest on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.060Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000+0.000
Nov 260.000+0.000
Nov 250.000+0.000
Nov 240.000+0.000
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000+0.000
Nov 200.000+0.000
Nov 190.000+0.000
Nov 180.000+0.000
Nov 170.000+0.000
Nov 160.000+0.000
Nov 150.000+0.000
Nov 140.000+0.000
Nov 130.000+0.000
Nov 120.000-0.037
Nov 110.037-0.006
Nov 100.044-0.005
Nov 90.049+0.000
Nov 80.049+0.000
Nov 70.049-0.003
Nov 60.052+0.001
Nov 50.051-0.001
Nov 40.053+0.010
Nov 30.043+0.000
Nov 20.043-0.000
Nov 10.043-0.002
Oct 310.045+0.000
Oct 300.045+0.000
Oct 290.045—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Gas Transmission NorthwestCOYOTE SPRINGS 2

Gas Transmission NorthwestPlant location from EIA Form 860 (plant 7350).

Recent notices on Gas Transmission Northwest

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gas Transmission Northwest notices →

Gas Transmission Northwest · posted 2026-11-24 · informational
Gas Transmission Northwest · posted 2026-11-11 · informational
Gas Transmission Northwest · posted 2026-11-04 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, COYOTE SPRINGS 2 (Gas Transmission Northwest loc 314579) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gtn/314579/