Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

RAPID RIVER

Great Lakes Gas Transmission · Loc 11623 · DELTA, Michigan
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.014
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.013
Bcf/d
30-day average
0.014
30 of 30 days posted
30-day high
0.019
Nov 9
30-day low
0.010
Nov 2
Operating capacity
0.132
Bcf/d as posted, id3 cycle
Utilization
11%
headroom 89%

Scheduled quantities as posted by Great Lakes Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0050.0100.0150.020Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.014+0.000
Nov 250.014+0.002
Nov 240.012+0.000
Nov 230.012+0.000
Nov 220.012+0.000
Nov 210.012+0.000
Nov 200.012+0.000
Nov 190.012-0.001
Nov 180.013-0.002
Nov 170.015+0.000
Nov 160.015+0.000
Nov 150.015+0.000
Nov 140.015+0.000
Nov 130.015+0.001
Nov 120.014-0.001
Nov 110.015+0.000
Nov 100.015-0.003
Nov 90.019+0.000
Nov 80.019+0.000
Nov 70.019+0.008
Nov 60.010-0.001
Nov 50.011-0.001
Nov 40.013+0.001
Nov 30.012+0.002
Nov 20.010-0.002
Nov 10.012-0.001
Oct 310.013-0.000
Oct 300.013+0.000
Oct 290.013+0.000
Oct 280.013—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Great Lakes Gas TransmissionRAPID RIVER

Great Lakes Gas TransmissionPlaced at the center of Delta, MI — approximate; the exact meter site is not published.

Matched to this meter

Enercast’s scorer tied these notices to this exact posted point.

Great Lakes Gas Transmission · posted 2026-10-01 · compressor issue
Great Lakes Gas Transmission declared unplanned maintenance at Rapid River Compressor Station 9 effective October 1, 2026, with a critical capacity reduction taking effect October 2 until further notice. Eastbound capacity at Crystal Falls CS (LOC #3911656) will be reduced by 504…
Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Great Lakes Gas Transmission · posted 2026-10-12 · effective 2009-10-13 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, RAPID RIVER (Great Lakes Gas Transmission loc 11623) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/greatlakes/11623/