Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Treasure Coast Energy Center

Florida Gas Transmission · Loc 78443
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.015
Bcf/d
30-day average
0.015
30 of 30 days posted
30-day high
0.045
Oct 31
30-day low
0.000
Nov 27
Operating capacity
0.177
Bcf/d as posted, evening cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Florida Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.060Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000+0.000
Nov 260.000-0.013
Nov 250.013-0.003
Nov 240.017-0.008
Nov 230.025+0.000
Nov 220.025+0.000
Nov 210.025+0.005
Nov 200.020+0.020
Nov 190.000+0.000
Nov 180.000+0.000
Nov 170.000+0.000
Nov 160.000+0.000
Nov 150.000+0.000
Nov 140.000+0.000
Nov 130.000+0.000
Nov 120.000+0.000
Nov 110.000+0.000
Nov 100.000-0.015
Nov 90.015+0.000
Nov 80.015-0.000
Nov 70.015+0.015
Nov 60.000-0.015
Nov 50.015-0.003
Nov 40.018-0.009
Nov 30.026-0.018
Nov 20.044+0.000
Nov 10.044-0.001
Oct 310.045+0.000
Oct 300.045+0.000
Oct 290.045—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Florida Gas TransmissionTreasure Coast Energy Center

Florida Gas TransmissionPlant location from EIA Form 860 (plant 56400).

No recent notices matched or named this point, and no severity 3+ notices on Florida Gas Transmission in the last 30 days. See all Florida Gas Transmission notices.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Treasure Coast Energy Center (Florida Gas Transmission loc 78443) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/fgt/78443/