Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Port Everglades Energy Center M&R-FPL

Florida Gas Transmission · Loc 100041
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.157
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.157
Bcf/d
30-day average
0.155
30 of 30 days posted
30-day high
0.177
Nov 3
30-day low
0.117
Nov 19
Operating capacity
0.217
Bcf/d as posted, evening cycle
Utilization
72%
headroom 28%

Scheduled quantities as posted by Florida Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.157+0.000
Nov 260.157+0.000
Nov 250.157+0.000
Nov 240.157+0.000
Nov 230.157+0.000
Nov 220.157+0.000
Nov 210.157+0.000
Nov 200.157+0.040
Nov 190.117-0.030
Nov 180.147+0.000
Nov 170.147+0.000
Nov 160.147+0.000
Nov 150.147+0.000
Nov 140.147+0.000
Nov 130.147+0.000
Nov 120.147+0.000
Nov 110.147+0.000
Nov 100.147+0.000
Nov 90.147+0.000
Nov 80.147+0.000
Nov 70.147+0.000
Nov 60.147+0.000
Nov 50.147-0.019
Nov 40.166-0.011
Nov 30.177+0.000
Nov 20.177+0.000
Nov 10.177+0.000
Oct 310.177+0.000
Oct 300.177+0.000
Oct 290.177—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Florida Gas TransmissionPort Everglades Energy Center M&R-FPL

Florida Gas TransmissionPlant location from EIA Form 860 (plant 617).

No recent notices matched or named this point, and no severity 3+ notices on Florida Gas Transmission in the last 30 days. See all Florida Gas Transmission notices.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Port Everglades Energy Center M&R-FPL (Florida Gas Transmission loc 100041) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/fgt/100041/