Hines Energy Complex-FPC

Florida Gas Transmission · Loc 63033
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.067
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.063
Bcf/d
30-day average
0.066
30 of 30 days posted
30-day high
0.120
Nov 11
30-day low
0.033
Nov 2
Operating capacity
0.400
Bcf/d as posted, evening cycle
Utilization
17%
headroom 83%

Scheduled quantities as posted by Florida Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.067+0.000
Nov 260.067+0.012
Nov 250.055-0.012
Nov 240.067+0.012
Nov 230.055-0.021
Nov 220.076+0.021
Nov 210.055+0.005
Nov 200.050-0.004
Nov 190.054+0.004
Nov 180.050+0.001
Nov 170.049+0.009
Nov 160.040+0.000
Nov 150.040-0.020
Nov 140.060-0.010
Nov 130.070-0.045
Nov 120.115-0.005
Nov 110.120+0.010
Nov 100.110+0.042
Nov 90.068+0.021
Nov 80.047-0.049
Nov 70.096+0.021
Nov 60.075-0.004
Nov 50.079-0.010
Nov 40.089+0.040
Nov 30.049+0.016
Nov 20.033-0.005
Nov 10.038-0.033
Oct 310.072+0.022
Oct 300.050-0.027
Oct 290.077—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Florida Gas TransmissionHines Energy Complex-FPC

Florida Gas TransmissionPlant location from EIA Form 860 (plant 7302).

No recent notices matched or named this point, and no severity 3+ notices on Florida Gas Transmission in the last 30 days. See all Florida Gas Transmission notices.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Hines Energy Complex-FPC (Florida Gas Transmission loc 63033) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/fgt/63033/