Stanton C Gas Igniter Conversion-OUC

Florida Gas Transmission · Loc 100013
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.003
Bcf/d
30-day average
0.005
30 of 30 days posted
30-day high
0.037
Nov 10
30-day low
0.000
Nov 27
Operating capacity
0.058
Bcf/d as posted, evening cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Florida Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0100.0200.0300.040Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000+0.000
Nov 260.000-0.006
Nov 250.006-0.008
Nov 240.015+0.014
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000+0.000
Nov 200.000-0.022
Nov 190.022+0.022
Nov 180.000-0.004
Nov 170.005+0.004
Nov 160.001+0.000
Nov 150.001+0.000
Nov 140.001-0.001
Nov 130.002-0.004
Nov 120.006-0.000
Nov 110.006-0.031
Nov 100.037+0.029
Nov 90.007-0.001
Nov 80.008+0.000
Nov 70.008+0.001
Nov 60.007-0.000
Nov 50.008+0.000
Nov 40.008+0.000
Nov 30.008+0.008
Nov 20.000+0.000
Nov 10.000-0.001
Oct 310.001+0.000
Oct 300.001-0.000
Oct 290.001—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Florida Gas TransmissionStanton C Gas Igniter Conversion-OUC

Florida Gas TransmissionPlant location from EIA Form 860 (plant 564).

No recent notices matched or named this point, and no severity 3+ notices on Florida Gas Transmission in the last 30 days. See all Florida Gas Transmission notices.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Stanton C Gas Igniter Conversion-OUC (Florida Gas Transmission loc 100013) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/fgt/100013/