Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

MICHAEL KUHN IC

Equitrans, L.P. · Loc M5421825 · West Virginia
Gathering receipt · counted in Supply / Production
Gas day Nov 27
0.126
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.132
Bcf/d
30-day average
0.137
30 of 30 days posted
30-day high
0.191
Nov 16
30-day low
0.115
Nov 10
Operating capacity
0.155
Bcf/d as posted, evening cycle
Utilization
81%
headroom 19%

Scheduled quantities as posted by Equitrans, L.P. on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.126+0.000
Nov 260.126+0.000
Nov 250.125-0.000
Nov 240.126-0.015
Nov 230.141+0.000
Nov 220.141+0.000
Nov 210.141+0.015
Nov 200.126-0.015
Nov 190.141+0.000
Nov 180.141+0.000
Nov 170.141-0.050
Nov 160.191+0.000
Nov 150.191+0.000
Nov 140.191+0.051
Nov 130.140+0.024
Nov 120.116+0.000
Nov 110.116+0.000
Nov 100.115-0.001
Nov 90.116+0.000
Nov 80.116-0.010
Nov 70.126-0.015
Nov 60.141-0.015
Nov 50.155+0.030
Nov 40.126-0.020
Nov 30.145+0.030
Nov 20.116+0.000
Nov 10.116-0.024
Oct 310.140+0.000
Oct 300.140+0.000
Oct 290.140—
49 more days on file for this meter, back to September 10, 2026. Full meter-level history is part of Institutional (API and downloads).

State only (West Virginia) — the meter's exact site is not geocoded; the ring marks the state, not the point.

No recent notices matched or named this point, and no severity 3+ notices on Equitrans, L.P. in the last 30 days.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MICHAEL KUHN IC (Equitrans, L.P. loc M5421825) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/equitrans-l-p/m5421825/