Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

MOBLEY PROCESSING FACILITY(TO ETRN)

Equitrans, L.P. · Loc 24605 · West Virginia
Processing plant · counted in Supply / Production
Gas day Nov 26
0.671
Bcf/d scheduled
Δ Day-over-day
+0.020
vs Nov 25
7-day average
0.674
Bcf/d
30-day average
0.658
30 of 30 days posted
30-day high
0.692
Nov 15
30-day low
0.568
Oct 28
Operating capacity
1.620
Bcf/d as posted, evening cycle
Utilization
41%
headroom 59%

Scheduled quantities as posted by Equitrans, L.P. on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.200.400.600.80Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.671+0.020
Nov 250.651-0.020
Nov 240.671-0.009
Nov 230.681+0.000
Nov 220.681+0.000
Nov 210.681-0.001
Nov 200.682-0.004
Nov 190.686+0.024
Nov 180.662+0.006
Nov 170.655-0.017
Nov 160.672-0.020
Nov 150.692+0.000
Nov 140.692+0.004
Nov 130.688+0.031
Nov 120.657-0.001
Nov 110.658+0.001
Nov 100.657-0.016
Nov 90.673+0.000
Nov 80.673-0.001
Nov 70.674+0.045
Nov 60.629+0.043
Nov 50.586+0.014
Nov 40.573-0.086
Nov 30.659-0.008
Nov 20.667-0.002
Nov 10.669+0.007
Oct 310.662+0.020
Oct 300.642+0.007
Oct 290.635+0.067
Oct 280.568—
48 more days on file for this meter, back to September 10, 2026. Full meter-level history is part of Institutional (API and downloads).

State only (West Virginia) — the meter's exact site is not geocoded; the ring marks the state, not the point.

No recent notices matched or named this point, and no severity 3+ notices on Equitrans, L.P. in the last 30 days.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MOBLEY PROCESSING FACILITY(TO ETRN) (Equitrans, L.P. loc 24605) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/equitrans-l-p/24605/