Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

BLYTHENR/EPNG (IBLYTHE) BLYTHE ENER

El Paso Natural Gas (EPNG) · Loc 314980
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.005
Bcf/d scheduled
Δ Day-over-day
+0.005
vs Nov 26
7-day average
0.001
Bcf/d
30-day average
0.005
30 of 30 days posted
30-day high
0.039
Oct 29
30-day low
0.000
Nov 23
Operating capacity
0.080
Bcf/d as posted, evening cycle
Utilization
6%
headroom 94%

Scheduled quantities as posted by El Paso Natural Gas (EPNG) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0100.0200.0300.040Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.005+0.005
Nov 260.000-0.001
Nov 250.001+0.001
Nov 240.001+0.001
Nov 230.000-0.000
Nov 220.000-0.002
Nov 210.002-0.004
Nov 200.006+0.006
Nov 190.000-0.003
Nov 180.003+0.003
Nov 170.000-0.003
Nov 160.003+0.000
Nov 150.003+0.000
Nov 140.003+0.003
Nov 130.000-0.002
Nov 120.003+0.002
Nov 110.000-0.000
Nov 100.000+0.000
Nov 90.000-0.005
Nov 80.005+0.000
Nov 70.005-0.002
Nov 60.007+0.003
Nov 50.005+0.004
Nov 40.001-0.001
Nov 30.001-0.002
Nov 20.003-0.004
Nov 10.007+0.006
Oct 310.002-0.028
Oct 300.030-0.009
Oct 290.039—
86 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
El Paso Natural GasBLYTHENR/EPNG (IBLYTHE) BLYTHE ENER

El Paso Natural GasPlant location from EIA Form 860 (plant 55295).

Recent notices on El Paso Natural Gas (EPNG)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All El Paso Natural Gas (EPNG) notices →

El Paso Natural Gas (EPNG) · posted 2026-11-17 · effective 2026-11-17 · force majeure
EPNG has declared force majeure at Laguna Compressor Station in Cibola County, New Mexico following a compressor gasket leak. The station is unavailable while repairs are completed, reducing operational capacity through the CAPROCK N constraint by 77,194 Dth/d (0.077 Bcf/d) effec…
El Paso Natural Gas (EPNG) · posted 2026-11-17 · effective 2026-11-17 · informational
El Paso Natural Gas (EPNG) · posted 2026-11-04 · effective 2026-11-04 · informational
El Paso Natural Gas (EPNG) · posted 2026-11-03 · effective 2026-11-03 · force majeure
EPNG declared force majeure at Lincoln Compressor Station in Lincoln County, New Mexico due to a flame detection failure. This Update #1 escalates the capacity reduction through the CAPROCK N constraint from 214,491 Dth/d to 274,843 Dth/d (~0.275 Bcf/d), effective Intraday 1 Cycl…
El Paso Natural Gas (EPNG) · posted 2026-10-31 · effective 2026-10-31 · force majeure
EPNG has declared force majeure at its Roswell Compressor Station in Chaves County, New Mexico, following a turbo thrust bearing failure that has taken the station fully offline. Operational capacity through the CAPROCK N constraint will be reduced by 175,228 Dth/d (0.175 Bcf/d) …
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-29 · force majeure
EPNG Force Majeure Update #2 on Line No. 1600 (third-party line strike downstream of Waha Compressor Station, Reeves County TX) adds the WA CORN scheduling constraint to zero net capacity effective Intraday 1 Cycle (Cycle 3) on October 29, 2026, joining previously zeroed Imperial…
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-29 · force majeure
EPNG Update #1 on the Line 1600 third-party line strike downstream of Waha Compressor Station in Reeves County, TX: the repair now requires full pipeline replacement rather than a simple pressure restriction. Two additional point locations -- Imperial Receipt/Delivery (loc 58045)…
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-28 · force majeure
EPNG has declared force majeure on Line No. 1600 downstream of Waha Compressor Station in Reeves County, TX following a third-party line strike. The L1600EST constraint is initially capped at 0.250 Bcf/d effective Intraday 3 Cycle on October 28, dropping to zero effective the Eve…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, BLYTHENR/EPNG (IBLYTHE) BLYTHE ENER (El Paso Natural Gas (EPNG) loc 314980) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/epng/314980/