Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

SRP/EPNG (DSRP PHX) MARICOPA

El Paso Natural Gas (EPNG) · Loc 301043
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.254
Bcf/d scheduled
Δ Day-over-day
+0.019
vs Nov 26
7-day average
0.259
Bcf/d
30-day average
0.239
30 of 30 days posted
30-day high
0.304
Nov 25
30-day low
0.155
Nov 3
Operating capacity
1.110
Bcf/d as posted, evening cycle
Utilization
23%
headroom 77%

Scheduled quantities as posted by El Paso Natural Gas (EPNG) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.100.200.300.40Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.254+0.019
Nov 260.235-0.069
Nov 250.304+0.019
Nov 240.285-0.006
Nov 230.291+0.044
Nov 220.247+0.051
Nov 210.196-0.025
Nov 200.221+0.007
Nov 190.214-0.078
Nov 180.292+0.000
Nov 170.292+0.010
Nov 160.282+0.037
Nov 150.245+0.071
Nov 140.174-0.076
Nov 130.251-0.020
Nov 120.271+0.012
Nov 110.258-0.015
Nov 100.273+0.018
Nov 90.256-0.012
Nov 80.268-0.013
Nov 70.280+0.065
Nov 60.215-0.020
Nov 50.235+0.046
Nov 40.189+0.034
Nov 30.155-0.009
Nov 20.165-0.042
Nov 10.207+0.024
Oct 310.184-0.024
Oct 300.208-0.018
Oct 290.225—
86 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
El Paso Natural GasSRP/EPNG (DSRP PHX) MARICOPA

El Paso Natural GasPlaced at the center of Maricopa, AZ — approximate; the exact meter site is not published.

Recent notices on El Paso Natural Gas (EPNG)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All El Paso Natural Gas (EPNG) notices →

El Paso Natural Gas (EPNG) · posted 2026-11-17 · effective 2026-11-17 · force majeure
EPNG has declared force majeure at Laguna Compressor Station in Cibola County, New Mexico following a compressor gasket leak. The station is unavailable while repairs are completed, reducing operational capacity through the CAPROCK N constraint by 77,194 Dth/d (0.077 Bcf/d) effec…
El Paso Natural Gas (EPNG) · posted 2026-11-17 · effective 2026-11-17 · informational
El Paso Natural Gas (EPNG) · posted 2026-11-04 · effective 2026-11-04 · informational
El Paso Natural Gas (EPNG) · posted 2026-11-03 · effective 2026-11-03 · force majeure
EPNG declared force majeure at Lincoln Compressor Station in Lincoln County, New Mexico due to a flame detection failure. This Update #1 escalates the capacity reduction through the CAPROCK N constraint from 214,491 Dth/d to 274,843 Dth/d (~0.275 Bcf/d), effective Intraday 1 Cycl…
El Paso Natural Gas (EPNG) · posted 2026-10-31 · effective 2026-10-31 · force majeure
EPNG has declared force majeure at its Roswell Compressor Station in Chaves County, New Mexico, following a turbo thrust bearing failure that has taken the station fully offline. Operational capacity through the CAPROCK N constraint will be reduced by 175,228 Dth/d (0.175 Bcf/d) …
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-29 · force majeure
EPNG Force Majeure Update #2 on Line No. 1600 (third-party line strike downstream of Waha Compressor Station, Reeves County TX) adds the WA CORN scheduling constraint to zero net capacity effective Intraday 1 Cycle (Cycle 3) on October 29, 2026, joining previously zeroed Imperial…
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-29 · force majeure
EPNG Update #1 on the Line 1600 third-party line strike downstream of Waha Compressor Station in Reeves County, TX: the repair now requires full pipeline replacement rather than a simple pressure restriction. Two additional point locations -- Imperial Receipt/Delivery (loc 58045)…
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-28 · force majeure
EPNG has declared force majeure on Line No. 1600 downstream of Waha Compressor Station in Reeves County, TX following a third-party line strike. The L1600EST constraint is initially capped at 0.250 Bcf/d effective Intraday 3 Cycle on October 28, dropping to zero effective the Eve…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, SRP/EPNG (DSRP PHX) MARICOPA (El Paso Natural Gas (EPNG) loc 301043) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/epng/301043/