WASKOM PLANT F-185 DEL

Enable Gas Transmission (EGT) · Loc 12323 · Harrison, Texas
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 27
0.009
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.008
Bcf/d
30-day average
0.009
30 of 30 days posted
30-day high
0.009
Nov 13
30-day low
0.008
Nov 24
Operating capacity
0.150
Bcf/d as posted, evening cycle
Utilization
6%
headroom 94%

Scheduled quantities as posted by Enable Gas Transmission (EGT) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0030.0050.0070.010Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.009+0.000
Nov 260.009+0.000
Nov 250.009+0.001
Nov 240.008+0.000
Nov 230.008+0.000
Nov 220.008+0.000
Nov 210.008+0.000
Nov 200.008+0.000
Nov 190.008+0.000
Nov 180.008+0.000
Nov 170.008+0.000
Nov 160.008+0.000
Nov 150.008+0.000
Nov 140.008-0.001
Nov 130.009+0.000
Nov 120.009+0.000
Nov 110.009+0.000
Nov 100.009+0.000
Nov 90.009+0.000
Nov 80.009+0.000
Nov 70.009+0.000
Nov 60.009+0.000
Nov 50.009+0.000
Nov 40.009+0.000
Nov 30.009+0.000
Nov 20.009+0.000
Nov 10.009+0.001
Oct 310.009+0.000
Oct 300.009+0.000
Oct 290.009—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Enable Gas TransmissionWASKOM PLANT F-185 DEL

Enable Gas TransmissionPlaced at the center of Harrison, TX — approximate; the exact meter site is not published.

Recent notices on Enable Gas Transmission (EGT)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Enable Gas Transmission (EGT) notices →

Enable Gas Transmission (EGT) · posted 2026-11-19 · effective 2026-11-19 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.