Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

ROLLING HILLS

EGTS · Loc EB800 · Pennsylvania
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.103
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.100
Bcf/d
30-day average
0.072
30 of 30 days posted
30-day high
0.103
Nov 26
30-day low
0.022
Nov 6
Operating capacity
0.265
Bcf/d as posted, evening cycle
Utilization
39%
headroom 61%

Scheduled quantities as posted by EGTS on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.15Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.103+0.000
Nov 250.103+0.000
Nov 240.103+0.000
Nov 230.103+0.004
Nov 220.099+0.009
Nov 210.090-0.013
Nov 200.103+0.000
Nov 190.103+0.006
Nov 180.097+0.000
Nov 170.097+0.000
Nov 160.097+0.000
Nov 150.097+0.000
Nov 140.097+0.000
Nov 130.097+0.070
Nov 120.027+0.000
Nov 110.027+0.000
Nov 100.027-0.005
Nov 90.032+0.001
Nov 80.031+0.004
Nov 70.027+0.005
Nov 60.022+0.000
Nov 50.022-0.005
Nov 40.027-0.010
Nov 30.037-0.010
Nov 20.047+0.000
Nov 10.047-0.055
Oct 310.102+0.011
Oct 300.091-0.006
Oct 290.097+0.000
Oct 280.097—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Eastern Gas Transmission (EGTS)

Eastern Gas Transmission (EGTS)State only (Pennsylvania) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on EGTS

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All EGTS notices →

EGTS · posted 2026-11-18 · effective 2026-11-19 · informational
EGTS · posted 2026-11-16 · effective 2026-11-17 · informational
EGTS · posted 2026-11-13 · effective 2026-11-13 · informational
EGTS · posted 2026-11-09 · effective 2026-11-11 · informational
EGTS · posted 2026-11-08 · effective 2026-11-10 · informational
EGTS · posted 2026-11-06 · effective 2026-11-06 · informational
EGTS · posted 2026-11-06 · effective 2026-11-10 · informational
EGTS · posted 2026-11-05 · effective 2026-11-07 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ROLLING HILLS (EGTS loc EB800) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/egts/eb800/