HOLLICK RUN ROAD

EGTS · Loc EB720 · West Virginia
Gathering receipt · counted in Supply / Production
Gas day Nov 27
0.379
Bcf/d scheduled
Δ Day-over-day
-0.012
vs Nov 26
7-day average
0.388
Bcf/d
30-day average
0.351
30 of 30 days posted
30-day high
0.424
Oct 29
30-day low
0.278
Nov 10
Operating capacity
0.396
Bcf/d as posted, evening cycle
Utilization
96%
headroom 4%

Scheduled quantities as posted by EGTS on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.200.400.60Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.379-0.012
Nov 260.390+0.004
Nov 250.386-0.004
Nov 240.390-0.000
Nov 230.390-0.000
Nov 220.390+0.000
Nov 210.390+0.006
Nov 200.384+0.042
Nov 190.341-0.033
Nov 180.374+0.024
Nov 170.350-0.015
Nov 160.365+0.000
Nov 150.365-0.003
Nov 140.368+0.025
Nov 130.343+0.056
Nov 120.287-0.000
Nov 110.287+0.010
Nov 100.278-0.062
Nov 90.340-0.020
Nov 80.361+0.020
Nov 70.340+0.042
Nov 60.298+0.007
Nov 50.291+0.013
Nov 40.278-0.006
Nov 30.283-0.046
Nov 20.330+0.000
Nov 10.330-0.075
Oct 310.405+0.000
Oct 300.405-0.019
Oct 290.424—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Eastern Gas Transmission (EGTS)

Eastern Gas Transmission (EGTS)State only (West Virginia) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on EGTS

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All EGTS notices →

EGTS · posted 2026-11-18 · effective 2026-11-19 · informational
EGTS · posted 2026-11-16 · effective 2026-11-17 · informational
EGTS · posted 2026-11-13 · effective 2026-11-13 · informational
EGTS · posted 2026-11-09 · effective 2026-11-11 · informational
EGTS · posted 2026-11-08 · effective 2026-11-10 · informational
EGTS · posted 2026-11-06 · effective 2026-11-06 · informational
EGTS · posted 2026-11-06 · effective 2026-11-10 · informational
EGTS · posted 2026-11-05 · effective 2026-11-07 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, HOLLICK RUN ROAD (EGTS loc EB720) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/egts/eb720/