Gas day Nov 26
0.060
Bcf/d scheduled
Δ Day-over-day
-0.008
vs Nov 25
7-day average
0.059
Bcf/d
30-day average
0.064
30 of 30 days posted
30-day high
0.075
Nov 16
30-day low
0.045
Nov 23
Operating capacity
0.300
Bcf/d as posted, evening cycle
Utilization
20%
headroom 80%
Scheduled quantities as posted by EGTS on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.060 | -0.008 |
| Nov 25 | 0.069 | +0.008 |
| Nov 24 | 0.060 | +0.015 |
| Nov 23 | 0.045 | -0.015 |
| Nov 22 | 0.060 | +0.000 |
| Nov 21 | 0.060 | +0.000 |
| Nov 20 | 0.060 | +0.000 |
| Nov 19 | 0.060 | +0.000 |
| Nov 18 | 0.060 | +0.006 |
| Nov 17 | 0.054 | -0.021 |
| Nov 16 | 0.075 | +0.000 |
| Nov 15 | 0.075 | +0.000 |
| Nov 14 | 0.075 | +0.000 |
| Nov 13 | 0.075 | +0.000 |
| Nov 12 | 0.075 | +0.015 |
| Nov 11 | 0.060 | +0.000 |
| Nov 10 | 0.060 | +0.000 |
| Nov 9 | 0.060 | +0.000 |
| Nov 8 | 0.060 | +0.000 |
| Nov 7 | 0.060 | +0.000 |
| Nov 6 | 0.060 | +0.000 |
| Nov 5 | 0.060 | +0.000 |
| Nov 4 | 0.060 | +0.000 |
| Nov 3 | 0.060 | +0.000 |
| Nov 2 | 0.060 | +0.000 |
| Nov 1 | 0.060 | -0.015 |
| Oct 31 | 0.075 | +0.005 |
| Oct 30 | 0.070 | -0.002 |
| Oct 29 | 0.072 | +0.000 |
| Oct 28 | 0.072 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Eastern Gas Transmission (EGTS)State only (Pennsylvania) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
Recent notices on EGTS
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All EGTS notices →
EGTS · posted 2026-11-18 · effective 2026-11-19 · informational
EGTS · posted 2026-11-16 · effective 2026-11-17 · informational
SEV 3/5Receipt Restrictions Update
EGTS · posted 2026-11-13 · effective 2026-11-13 · informational
EGTS · posted 2026-11-09 · effective 2026-11-11 · informational
EGTS · posted 2026-11-08 · effective 2026-11-10 · informational
EGTS · posted 2026-11-06 · effective 2026-11-06 · informational
EGTS · posted 2026-11-06 · effective 2026-11-10 · informational
EGTS · posted 2026-11-05 · effective 2026-11-07 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on EGTS
- HOLLICK RUN ROAD 0.382 Bcf/d
- PLUM RUN (TL400) 0.295 Bcf/d
- BELL POINT 2 (TL-474/LN-19) 0.272 Bcf/d
- WHITE STATION (TL400) 0.256 Bcf/d
- WAHLVILLE M&R (TL-400) 0.234 Bcf/d
- HUSTED GLENN RD 0.210 Bcf/d
- DENMARK (TL-591) 0.156 Bcf/d
- LEE HILL ROAD 0.141 Bcf/d
Cite thisEnercast PipeScrape, BURELL (LN-26) (EGTS loc EB700) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/egts/eb700/