Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

MEDIX RUN M&R (LN-50)

EGTS · Loc 41701
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.083
Bcf/d scheduled
Δ Day-over-day
-0.010
vs Nov 26
7-day average
0.085
Bcf/d
30-day average
0.057
30 of 30 days posted
30-day high
0.106
Nov 17
30-day low
0.000
Nov 7
Operating capacity
0.155
Bcf/d as posted, evening cycle
Utilization
53%
headroom 47%

Scheduled quantities as posted by EGTS on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.083-0.010
Nov 260.093+0.012
Nov 250.081+0.000
Nov 240.081-0.005
Nov 230.086+0.000
Nov 220.086+0.000
Nov 210.086-0.005
Nov 200.091-0.005
Nov 190.096+0.000
Nov 180.096-0.010
Nov 170.106+0.011
Nov 160.095+0.025
Nov 150.070-0.001
Nov 140.070+0.010
Nov 130.060-0.020
Nov 120.081-0.005
Nov 110.086+0.015
Nov 100.070+0.020
Nov 90.050+0.040
Nov 80.010+0.010
Nov 70.000+0.000
Nov 60.000+0.000
Nov 50.000+0.000
Nov 40.000+0.000
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000-0.005
Oct 310.005-0.045
Oct 300.050-0.034
Oct 290.084—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Eastern Gas Transmission (EGTS)MEDIX RUN M&R (LN-50)

Eastern Gas Transmission (EGTS)Placed at the center of Clearfield, PA — approximate; the exact meter site is not published.

Recent notices on EGTS

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All EGTS notices →

EGTS · posted 2026-11-18 · effective 2026-11-19 · informational
EGTS · posted 2026-11-16 · effective 2026-11-17 · informational
EGTS · posted 2026-11-13 · effective 2026-11-13 · informational
EGTS · posted 2026-11-09 · effective 2026-11-11 · informational
EGTS · posted 2026-11-08 · effective 2026-11-10 · informational
EGTS · posted 2026-11-06 · effective 2026-11-06 · informational
EGTS · posted 2026-11-06 · effective 2026-11-10 · informational
EGTS · posted 2026-11-05 · effective 2026-11-07 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MEDIX RUN M&R (LN-50) (EGTS loc 41701) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/egts/41701/